Traditional and fuzzy goal programming approaches for resource dependent assembly line balancing problem
نویسندگان
چکیده
In this study, two goal programming models are proposed for balancing resource dependent assembly lines with precise and fuzzy goals in order to provide flexibility decision makers based on their environment preferred priorities. Three conflicting goals, namely, total number of utilized workstations, cycle time cost additional resources (equipment assistant workers) considered. The validated illustrative examples scenario analyses performed different priority levels the goals. results show that formulations valid useful lines.
منابع مشابه
Fuzzy multi-objective assembly line balancing problem: Fuzzy mathematical programming approach
Design of assembly line is done in order to more coordinate a collection of some consecutive work stations for the aim of obtaining more productivity from the work stations and workers. The stations are arranged in a way to have a continuous and constant material flow. In this paper a multi-objective formulation for assembly line balancing is introduced. As a solution approach a two-step approa...
متن کاملgenetic algorithms for assembly line balancing problem
there are some machineries and equipments as well as relatively fix amount of human resources involved in any production process. in many cases, by observing operational method of a process, one may see that some of these machineries are not working, but on the other hand, other equipments are continuously working, and many parts are set in front of them, waiting to be set up over machines to c...
متن کاملMeta-heuristic Approaches for the Assembly Line Balancing Problem
Assembly line balancing problem (ALBP) is a decision problem arising when designing or redesigning an assembly line and it consists in finding the optimal assignment of tasks among the workstations corresponding to some objectives. This paper deals with the single-model ALBP with the aim of minimizing the cycle time and maximizing the workload smoothness among the workstations. In order to solv...
متن کاملA goal programming approach to simple U-line balancing problem
In this paper, a goal programming model for the simple U-line balancing (ULB) problem is developed. The model is based on the integer programming formulation developed by Urban [Urban, Note: Optimal balancing of U-shaped assembly lines, Management Science 44(5) (1998) 738–741] for the ULB problem and the goal model of Deckro and Rangachari [Deckro, Rangachari, A goal approach to assembly line b...
متن کاملAssembly line balancing to minimize balancing loss and system loss
Assembly Line production is one of the widely used basic principles in production system. The problem of Assembly Line Balancing deals with the distribution of activities among the workstations so that there will be maximum utilization of human resources and facilities without disturbing the work sequence. Research works reported in the literature mainly deals with minimization of idle time i.e...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Numerical Algebra, Control and Optimization
سال: 2023
ISSN: ['2155-3297', '2155-3289']
DOI: https://doi.org/10.3934/naco.2023003