Train delay analysis and prediction based on big data fusion
                    
                        
                            نویسندگان
                            
                            
                        
                        
                    
                    
                    چکیده
منابع مشابه
Power Big Data Fusion Prediction
This paper is a research on the characteristics of power big data. According to the characteristics of “large volume”, “species diversity”, “sparse value density”, “fast speed” of the power big data, a prediction model of multi-source information fusion for large data is established, the fusion prediction of various parameters of the same object is realized. A combined algorithm of Map Reduce a...
متن کاملStochastic Delay Prediction in Large Train Networks
In daily operation, railway traffic always deviates from the planned schedule to a certain extent. Primary initial delays of trains may cause a whole cascade of secondary delays of other trains over the entire network. In this paper, we propose a stochastic model for delay propagation and forecasts of arrival and departure events which is applicable to all kind of public transport (not only to ...
متن کاملData Mining for Traffic Prediction and Analysis using Big Data
Today we are living in a data-driven world. Developments in data generation, gathering and storing technology have empowered organizations to gather data sets of massive size. Data mining is a term that blends traditional data analysis methods with cultured algorithms to handle the tasks stood by these new forms of data sets. This paper is a comparative analysis of various Data Mining of traffi...
متن کاملiPRODICT - Intelligent Process Prediction based on Big Data Analytics
The major purpose of the iPRODICT research project is to operationalize industrial internet of things driven predictive and prescriptive analytics by embedding it to the operational processes. Particularly, within an interdisciplinary team of researchers and industry experts, we investigate an integration of diverse technologies to enable real time sensor data driven decision making for process...
متن کاملFusion and causal analysis in big marketing data sets
Since so many marketing studies reflect differing aspects of consumer behavior, there is today a critical need for data fusion. But fusion can be challenging, especially when we are talking about fusing thousands of variables. In this article, we present an approach which solves this problem in a highly efficient manner. Another problem is in applying causal types of models (as opposed to tradi...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Transportation Safety and Environment
سال: 2019
ISSN: 2631-4428
DOI: 10.1093/tse/tdy001