Trial Panels – A Useful Prerequisite for Cut off Wall Execution: Upper Gotvand Dam
نویسندگان
چکیده
منابع مشابه
The Effect of Cut-off Wall on Seepage and Uplift Pressure under Earth Dam (Case Study: Shamil Dam in Iran)
Design of earth dams and their problems are important during construction and after it,because of their potential hazards and failure for downstream population. The dam foundation seepage control the the importance from the perspective of a major engineering project and explain the economic performance of each project is allocated. among activities that can be used to prevent piping phenomena a...
متن کاملHuman Life Saving by Simulation of Dam Break Using Flow-3d (a Case Study: Upper Gotvand Dam)
Dam break analysis plays a very important role in the risk assessment of dams. Large dams pose significantly higher risks to the people and property downstream of the dam as compared to smaller dams. So the flooding risk due to the possible failure of large dams is more crucial. The simulation of exceptional events characterized by high hydraulic and hydro-geologic risk is an actual problem for...
متن کاملThe Investigation of Effective Factors in the Removal of Bentonite Jelly from the Joints of Cut-off Wall Panels
In the construction process of a plastic concrete cut-off wall, concreting is usually performed using the termie pipe method. In this method, concreting is performed from the lowest point in the excavated trench (containing the slurry) using a funnel and the pipe connected to it. The concrete poured in the funnel gradually settles in the panel through the termie pipe which is beneath the slurry...
متن کاملThe First Cut- off Wall in the Indian Himalayas for the Dam of the Dhauliganga Hydroelectric Project
In the far north of Uttar Pradesh Province in the Indian Himalayas; the 280 MW Dhauliganga hydroelectric power plant is under construction by National Hydroelectric Power Corporation ( NHPC ), a stateowned enterprise; and a joint venture of Kajima Corporation of Tokyo and Daewoo Corporation of Seoul. This project sets out to develop the lower section of the mountain cascade of the Dhauliganga r...
متن کاملthe investigation of effective factors in the removal of bentonite jelly from the joints of cut-off wall panels
in the construction process of a plastic concrete cut-off wall, concreting is usually performed using the termie pipe method. in this method, concreting is performed from the lowest point in the excavated trench (containing the slurry) using a funnel and the pipe connected to it. the concrete poured in the funnel gradually settles in the panel through the termie pipe which is beneath the slurry...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Engineering and Technology
سال: 2016
ISSN: 1793-8236
DOI: 10.7763/ijet.2016.v8.852