Two-Agent Single-Machine Scheduling of Jobs with Time-Dependent Processing Times and Ready Times
نویسندگان
چکیده
منابع مشابه
Single-machine scheduling with time window-dependent processing times
In the one-machine scheduling problems analysed in this paper, the processing time of a job depends on the time at which the job is started. More precisely, the horizon is divided into time windows and with each one a coe cient is associated that is used to determine the actual processing time of a job starting in it. Two models are introduced, and one of them has direct connections with models...
متن کاملGENETIC AND TABU SEARCH ALGORITHMS FOR THE SINGLE MACHINE SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SET-UP TIMES AND DETERIORATING JOBS
This paper introduces the effects of job deterioration and sequence dependent set- up time in a single machine scheduling problem. The considered optimization criterion is the minimization of the makespan (Cmax). For this purpose, after formulating the mathematical model, genetic and tabu search algorithms were developed for the problem. Since population diversity is a very important issue in ...
متن کاملScheduling jobs with position-dependent processing times
Bachman and Janiak provided a sketch of the proof that the problem 1|ri,pi(v)1⁄4 ai/v|Cmax is NP-hard in the strong sense. However, they did not show how to avoid using harmonic numbers whose encoding is not pseudo-polynomial, which makes the proof incomplete. In this corrigendum, we provide a new complete proof. Journal of the Operational Research Society (2012) 63, 1018–1020. doi:10.1057/jors...
متن کاملSingle-machine scheduling problems with past-sequence-dependent delivery times and position-dependent processing times
We consider single-machine scheduling problems with past-sequence-dependent (p-s-d) job delivery times. The p-s-d delivery time is needed to remove any waiting time-induced adverse effects on the job’s condition (prior to delivering the job to the customer) and it is therefore proportional to the job’s waiting time. We show that single-machine scheduling problems with p-s-d delivery times and w...
متن کاملMachine scheduling with resource dependent processing times
We consider several parallel machine scheduling settings with the objective to minimize the schedule makespan. The most general of these settings is unrelated parallel machine scheduling. We assume that, in addition to its machine dependence, the processing time of any job is dependent on the usage of a scarce renewable resource. A given amount of that resource, e.g. workers, can be distributed...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Mathematical Problems in Engineering
سال: 2013
ISSN: 1024-123X,1563-5147
DOI: 10.1155/2013/806325