Two Parallel Machines Scheduling with Two-Vehicle Job Delivery to Minimize Makespan

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Unbounded parallel batch scheduling with job delivery to minimize makespan

We consider unbounded parallel batch scheduling with job delivery to minimize makespan. When the jobs have identical size, we provide a polynomial-time algorithm. When the jobs have non-identical sizes, we provide a heuristic with a worst-case performance ratio 7/4. c © 2008 Published by Elsevier B.V.

متن کامل

Single Machine Scheduling with Job Delivery to minimize makespan

In the single machine scheduling problem with job delivery to minimize makespan, jobs are processed on a single machine and delivered by a capacitated vehicle to their respective customers. We first consider the special case with a single customer, that is, all jobs have the same transportation time. Chang and Lee (2004) proved that this case is strongly NP-hard. They also provided a heuristic ...

متن کامل

Scheduling jobs with release dates and tails on two unrelated parallel machines to minimize the makespan

In this paper we deal with the problem of assigning a set of n jobs, with release dates and tails, to either one of two unrelated parallel machines and scheduling each machine so that the makespan is minimized. This problem will be denoted by R2jri; qijCmax. The model generalizes the problem on one machine 1jri; qijCmax, for which a very ecient algorithm exists. In this paper we describe a Bra...

متن کامل

Scheduling two interfering job sets on uniform parallel machines with makespan and cost functions

We consider a m uniform parallel machines scheduling problem with two jobs A and B with nA and nB operations, respectively, and equal processing times. Job A is associated with a general cost function F, whereas makespan is considered for job B. As we are dealing with two conflicting criteria, we focus on the calculation of strict Pareto optima for F and C max criteria. We also tackle some part...

متن کامل

Scheduling parallel jobs to minimize the makespan

We consider the NP-hard problem of scheduling parallel jobs with release dates on identical parallel machines to minimize the makespan. A parallel job requires simultaneously a prespecified, job-dependent number of machines when being processed. We prove that the makespan of any nonpreemptive list-schedule is within a factor of 2 of the optimal preemptive makespan. This gives the best-known app...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Complexity

سال: 2020

ISSN: 1076-2787,1099-0526

DOI: 10.1155/2020/1647401