Underlying Causes of Construction Project Delay: A Review
نویسندگان
چکیده
Delay is a worldwide problem which normally occurs in every project. of the project when period time completion date late or postponed. Since delayed, cost will have escalation risk contractors. Instead getting benefit from project, they gain losses. Similarly, other construction projects different countries are prone to face delays. The aim this study summarise causes delay previous study. Regarding delay, major world faced slow decision making, poor site management and supervision, shortage labour, changes scope work during construction, revising approving design documents, etc. identification important helps contractor plan well before start.
منابع مشابه
Analyzing delay causes in Egyptian construction projects
Construction delays are common problems in civil engineering projects in Egypt. These problems occur frequently during project life-time leading to disputes and litigation. Therefore, it is essential to study and analyze causes of construction delays. This research presents a list of construction delay causes retrieved from literature. The feedback of construction experts was obtained through i...
متن کاملdiscursive motivation/demotivation construction: a case of iranian efl majors
بررسی نقش گفتمان در شکل گیری یا کاهش انگیزش فراگیران زبان خارجی موضوع تحقیق نسبتاً جدیدی است. از این رو، تحقیقات کمی در این زمینه وجود دارد. به منظور پر کردن این خلاء ، مطالعه کنونی به بررسی فرآیند گفتمان مدار شکل گیری یا کاهش انگیزش دانشجویان ایرانی زبان انگلیسی پرداخت. نخست، این مطالعه به صورت آزمایشی با 7 نفر (? دانشجوی پسر و 5 دختر) از دانشجویان سال دوم دوره ی کارشناسی زبان و ادبیات انگلیسی ...
Identification of the Causes of Construction Delay in Malaysia
Construction delay is unavoidable in developing countries including Malaysia. It is defined as time overrun or extension of time for completion of a project. The purpose of the study is to determine the causes of delay in Malaysian construction industries based on previous worldwide research. The field survey conducted includes the experienced developers, consultants and contractors in Malaysia...
متن کاملA Study Identifying Causes of Construction Waste Production and Applying Safety Management on Construction Site
Background and purpose: In a recent century, the amount of construction waste has increased significantly. Although the building industry has a considerable role in the development of a society, it is regarded as an environmentally destructive. Source reduction is the highest goal in the waste management hierarchy and is in priority. It also has economic benefits by reducing costs associated wi...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: CONSTRUCTION
سال: 2022
ISSN: ['2785-8731']
DOI: https://doi.org/10.15282/construction.v2i2.7775