Uniform parallel machine scheduling with resource consumption constraint

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Study of Scheduling Problems with Machine Availability Constraint

In real world scheduling applications, machines might not be available during certain time periods due to deterministic or stochastic causes. In this article, the machine scheduling with availability constraints for both deterministic and stochastic cases with different environments, constraints and performance measures will be discussed. The existing body of research work in the literature wil...

متن کامل

Unrelated Parallel Machine Scheduling with Resource Dependent Processing Times

We consider unrelated machine scheduling problems with the objective to minimize the schedule makespan. In addition to its machinedependence, the processing time of any job is also dependent on the usage of a scarce renewable resource. An amount of k units of that resource, e.g. workers, can be distributed over the jobs in process, and the more of that resource is allocated to a job, the smalle...

متن کامل

Heuristics for Unrelated Parallel Machine Scheduling with Secondary Resource Constraints

This research deals with the problem of scheduling N jobs on M unrelated parallel machines. Each job has a due date and requires a single operation. A setup that includes detaching one die and attaching another from the appropriate die type is incurred if the type of the job scheduled is different from the last job on that machine. Due to the mechanical structure of machines and the fitness of ...

متن کامل

Scheduling for Dedicated Machine Constraint

We have proposed the heuristic Load Balancing (LB) scheduling (Shr et al., 2006a) (Shr et al., 2006b) (Shr et al., 2006c) and Multiagent Scheduling System (MSS) (Shr, et al. 2006d) approaches to provide solutions to the issue of dedicated photolithography machine constraint. The dedicated photolithography machine constraint, which is caused by the natural bias of the photolithography machine, i...

متن کامل

Machine scheduling with resource dependent processing times

We consider several parallel machine scheduling settings with the objective to minimize the schedule makespan. The most general of these settings is unrelated parallel machine scheduling. We assume that, in addition to its machine dependence, the processing time of any job is dependent on the usage of a scarce renewable resource. A given amount of that resource, e.g. workers, can be distributed...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Applied Mathematical Modelling

سال: 2015

ISSN: 0307-904X

DOI: 10.1016/j.apm.2014.10.012