Unrelated Parallel-Machine Scheduling Problems with General Truncated Job-Dependent Learning Effect
نویسندگان
چکیده
منابع مشابه
Unrelated Parallel-Machine Scheduling Problems with General Truncated Job-Dependent Learning Effect
In this paper, we consider scheduling problems with general truncated job-dependent learning effect on unrelated parallel-machine. The objective functions are to minimize total machine load, total completion (waiting) time, total absolute differences in completion (waiting) times respectively. If the number of machines is fixed, these problems can be solved in m O n 2 ( ) + time respectively, w...
متن کاملUnrelated Parallel Machine Scheduling with Resource Dependent Processing Times
We consider unrelated machine scheduling problems with the objective to minimize the schedule makespan. In addition to its machinedependence, the processing time of any job is also dependent on the usage of a scarce renewable resource. An amount of k units of that resource, e.g. workers, can be distributed over the jobs in process, and the more of that resource is allocated to a job, the smalle...
متن کاملMulti-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints
This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...
متن کاملABC-based manufacturing scheduling for unrelated parallel machines with machine-dependent and job sequence-dependent setup times
To date, the topic of unrelated parallel machine scheduling problems with machine-dependent and job sequence-dependent setup times has received relatively little research attention. In this study, a hybrid artificial bee colony (HABC) algorithm is presented to solve this problem with the objective of minimizing the makespan. The performance of the proposed HABC algorithmwas evaluated by compari...
متن کاملFlexible flowshop scheduling with equal number of unrelated parallel machines
This article addresses a multi-stage flowshop scheduling problem with equal number of unrelated parallel machines. The objective is to minimize the makespan for a given set of jobs in the system. This problem class is NP-hard in the strong sense, so a hybrid heuristic method for sequencing and then allocating operations of jobs to machines is developed. A number of test problems are randomly ge...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Applied Mathematics and Physics
سال: 2016
ISSN: 2327-4352,2327-4379
DOI: 10.4236/jamp.2016.41004