Unrelated parallel machines scheduling with deteriorating jobs and resource dependent processing times
نویسندگان
چکیده
منابع مشابه
Multi-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints
This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...
متن کاملUnrelated Parallel Machine Scheduling with Resource Dependent Processing Times
We consider unrelated machine scheduling problems with the objective to minimize the schedule makespan. In addition to its machinedependence, the processing time of any job is also dependent on the usage of a scarce renewable resource. An amount of k units of that resource, e.g. workers, can be distributed over the jobs in process, and the more of that resource is allocated to a job, the smalle...
متن کاملScheduling Jobs with Variable Job Processing Times on Unrelated Parallel Machines
m unrelated parallel machines scheduling problems with variable job processing times are considered, where the processing time of a job is a function of its position in a sequence, its starting time, and its resource allocation. The objective is to determine the optimal resource allocation and the optimal schedule to minimize a total cost function that dependents on the total completion (waitin...
متن کاملSolving the Problem of Scheduling Unrelated Parallel Machines with Limited Access to Jobs
Nowadays, by successful application of on time production concept in other concepts like production management and storage, the need to complete the processing of jobs in their delivery time is considered a key issue in industrial environments. Unrelated parallel machines scheduling is a general mood of classic problems of parallel machines. In some of the applications of unrelated parallel mac...
متن کاملScheduling jobs on parallel machines with sequence-dependent setup times
The study considers the scheduling problem of identical parallel machines subject to minimization of the maximumcompletion time and the maximum tardiness expressed in a linear convex objective function. The maximum completiontime or makespan is the date when the last job to be completed leaves the system. The maximum tardiness is indicated bythe job that is completed with the lo...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Applied Mathematical Modelling
سال: 2014
ISSN: 0307-904X
DOI: 10.1016/j.apm.2014.03.022