Use of plant woody species electrical potential for irrigation scheduling

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Plant Community Water Use and Invasibility of Semi-arid Shrublands by Woody Species in Southern California

Soil moisture is a key limiting resource in arid and semi-arid environments for woody shrub species. We assessed if three arid communities differed in their level of dry season soil moisture content and if the dominant species in these communities differed in their ability to use soil moisture. Water potential of all of the dominant woody plant species occurring in chaparral, coastal sage, and ...

متن کامل

Identification of Fibers of Woody and Non-woody Plant Species in Pulp and Papers

Now a days the paper factories, which because of environmental issues and lack of forest sources, use waste papers, need to identify fibers in raw materials to improve quality of recycled papers. In order to evaluate feasibility of fibers identification, papers of 9 Iranian important factories (12 different papers) were sampled and the frequency of identified species in papers was recorded in m...

متن کامل

Irrigation scheduling: advantages and pitfalls of plant-based methods.

This paper reviews the various methods available for irrigation scheduling, contrasting traditional water-balance and soil moisture-based approaches with those based on sensing of the plant response to water deficits. The main plant-based methods for irrigation scheduling, including those based on direct or indirect measurement of plant water status and those based on plant physiological respon...

متن کامل

the use of appropriate madm model for ranking the vendors of mci equipments using fuzzy approach

abstract nowadays, the science of decision making has been paid to more attention due to the complexity of the problems of suppliers selection. as known, one of the efficient tools in economic and human resources development is the extension of communication networks in developing countries. so, the proper selection of suppliers of tc equipments is of concern very much. in this study, a ...

15 صفحه اول

On electrical load tracking scheduling for a steel plant

Nolde and Morari [10] study a steel manufacturing scheduling problem where the tasks must be scheduled such that electricity consumption matches to a pre-specified periodic energy chart. They propose a continuous time integer linear programming formulation to solve the problem. In this note, we present an alternative continuous time formulation that improves significantly the computation time.

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Plant Signaling & Behavior

سال: 2015

ISSN: 1559-2324

DOI: 10.4161/15592324.2014.976487