Using oceanic-atmospheric oscillations for long lead time streamflow forecasting
نویسندگان
چکیده
منابع مشابه
Long lead-time streamflow forecasting of the North Platte River incorporating oceanic–atmospheric climate variability
متن کامل
Lead Agency National Oceanic and Atmospheric Administration
This document contains an Environmental Assessment (EA), Regulatory Impact Review (RIR), and Initial Regulatory Flexibility Analysis (IRFA) for two actions. The EA and IRFA analyze the impacts of the Federal actions to: 1) establishing the 2004 harvest specifications for groundfish target species in the groundfish fisheries of the Bering Sea, Aleutian Islands, and Gulf of Alaska fishery managem...
متن کاملReal-Time Data Assimilation for Operational Ensemble Streamflow Forecasting
Operational flood forecasting requires that accurate estimates of the uncertainty associated with modelgenerated streamflow forecasts be provided along with the probable flow levels. This paper demonstrates a stochastic ensemble implementation of the Sacramento model used routinely by the National Weather Service for deterministic streamflow forecasting. The approach, the simultaneous optimizat...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Water Resources Research
سال: 2009
ISSN: 0043-1397
DOI: 10.1029/2008wr006855