Validation of a Task Demand Measure (VACP) for Predicting Mental Workloads of Control Room Operators (A Case Study: Pars Combined Cycle Power Plant)
نویسندگان
چکیده
منابع مشابه
اعتبارسنجی یک روش ارزیابی نیاز وظیفه (VACP) برای پیشبینی بارکاری ذهنی اپراتورهای اتاق کنترل نیروگاه (مطالعه موردی: نیروگاه سیکل ترکیبی فارس)
Introduction: The progress of technology and modern technology has changed today’s workplaces and imposed more mental and cognitive demands to workers. Control room is an example of these workplaces. Currently, assessment of mental workload is a key point in the research and development of human-machine relationships in workplaces. This study aimed to validate an analytical approach in evaluati...
متن کاملa study on construction of iranian life tables: the case study of modified brass logit system
چکیده ندارد.
15 صفحه اولesp needs analysis of iranian ma students: a case study of university of isfahan
نیاز سنجی دانشجویان کارشناسی ارشد ایرانی در رابطه با زبان تخصصی: مطالعه ای در دانشگاه اصفهان هدف از این مطالعه بررسی نیازهای یادگیری زبان خارجی دانشجویان کارشناسی ارشد دانشجویان دانشگاه اصفهان در رشته های زیست شناسی، روانشناسی، تربیت بدنی، حسابداری و فلسفه ی غرب میباشد. در مجموع 80 دانشجودر پنج رشته ی متفاوت از دانشگاه اصفهان در این پژوهش شرکت داشتند.علاوه بر این هشتاد دانشجو،25 استاد دروس ت...
15 صفحه اولPredictive Analysis of Cognitive Errors of Control Room Operators: a Case Study in a Petrochemical Industry
Background and Aims: The aim of this study was to identify and assess human errors in a petrochemical plant using the Technique for the Retrospective and Predictive Analysis of Cognitive Errors (TRACEr). Methods: The sample size was all the eight operators of control room working in four shifts. In the first step, all tasks were analyzed using the hierarchical task analysis in order to identif...
متن کاملModeling of a Geothermal Cycle Condenser in a Combined Diesel Power Cycle: Case Study of 42 MW Diesel Power Plant in Moghan and Ardabil
This paper presents the results of a research into the feasibility of recovering waste heat and determining design parameters of a recovery boiler for a set of medium-speed diesel generators with a capacity of 7 MW (the nominal capacity of all units is 42 MW, which would be a study on a unit). And is used to generate electricity. The main purpose of this study is to design a thermal waste recov...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Ergonomics
سال: 2016
ISSN: 2345-5365
DOI: 10.21859/joe-04034