Work Breakdown Structure: A Tool for Software Project Scope Verification

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Work Breakdown Structure: A Tool for Software Project Scope Verification

Software project scope verification is a very important process in project scope management and it needs to be performed properly and thoroughly so as to avoid project rework and scope creep. Moreover, software scope verification is crucial in the process of delivering exactly what the customer requested and minimizing project scope changes. Well defined software scope eases the process of scop...

متن کامل

The work breakdown structure in software project management

The work breakdown structure (WBS) is a vehicle for breaking an engineering project down into subproject, tasks, subtasks, work packages, and so on. It is an important planning tool which links objectives with resources and activities in a logical framework. It becomes an important status monitor during the actual implementation as the completions of subtasks are measured against the project pl...

متن کامل

Project Management System Based on Work-Breakdown-Structure Process Model

We have developed a “WBS(Work Breakdown Structure) process model” for a business application software development project. We have also developed a project management system called “PRO-NAVI” which works on the “WBS process model.” This WBS process model” provides (1) mutual mapping between the “software development processes”, “activities”, “products”, “know-how,” “rules”, and “standards”, and...

متن کامل

CPAchecker: A Tool for Configurable Software Verification

Configurable software verification is a recent concept for expressing different program analysis and model checking approaches in one single formalism. This paper presents CPAchecker, a tool and framework that aims at easy integration of new verification components. Every abstract domain, together with the corresponding operations, implements the interface of configurable program analysis (CPA)...

متن کامل

A Software Component Verification Tool

Component-Based Software Engineering depends on reliable, robust components, since it may omit a unit test phase wholly or partially from the development cycle. This paper describes a tool that allows a component developer to design and run verification tests. In developing components for our library, we found it necessary to provide multiple mechanisms for identifying and capturing tests to ov...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Software Engineering & Applications

سال: 2013

ISSN: 0976-2221,0975-9018

DOI: 10.5121/ijsea.2013.4402