Workflow analysis of production lines with complete inspection and rework loops

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Performance Analysis of Production Systems with Rework Loops

This paper is devoted to the study of production systems with rework loops. Such systems are often encountered in manufacturing plants and accurate performance analysis is needed for design and continuous improvement. However, no analytical methods to evaluate its production rate are available in the current literature. In this paper, we present an aggregation procedure using overlapping decomp...

متن کامل

Lot sizing with rework and different inspection costs

This paper deals with the single machine multi-product lot scheduling problem in which defective items are produced in any production run of each product. We have adopted the common cycle scheduling policy and assumed that the setup times for production of each product can be non-zero. Further, we have assumed that defective items will be reworked and the inspection costs during the normal prod...

متن کامل

Bottlenecks in Production Lines with Rework: A Systems Approach

The bottleneck (BN) of a production system is a machine with the strongest effect on the system’s throughput. In this paper, a method for BN identification in serial lines with rework and Bernoulli machines is developed. In addition, the paper provides two system-theoretic results: First, it demonstrates that BNs may be shifting not only because of changes in machine and buffer parameters but a...

متن کامل

lot sizing with rework and different inspection costs

this paper deals with the single machine multi-product lot scheduling problem in which defective items are produced in any production run of each product. we have adopted the common cycle scheduling policy and assumed that the setup times for production of each product can be non-zero. further, we have assumed that defective items will be reworked and the inspection costs during the normal prod...

متن کامل

Optimum production and inspection modeling with minimal repair and rework considerations

This paper extends an integrated model of economic production quantity (EPQ) and preventive maintenance (PM) to incorporate possibilities of minimal repair and rework. Our model determines simultaneously the optimal number of inspections, the inspection interval, the EPQ, and the PM level. Numerical examples of Weibull shock models are given to show that allowing minimal repair and rework will ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Production Research

سال: 2010

ISSN: 0020-7543,1366-588X

DOI: 10.1080/00207540903469050