Workflow analysis of production lines with complete inspection and rework loops
نویسندگان
چکیده
منابع مشابه
Performance Analysis of Production Systems with Rework Loops
This paper is devoted to the study of production systems with rework loops. Such systems are often encountered in manufacturing plants and accurate performance analysis is needed for design and continuous improvement. However, no analytical methods to evaluate its production rate are available in the current literature. In this paper, we present an aggregation procedure using overlapping decomp...
متن کاملLot sizing with rework and different inspection costs
This paper deals with the single machine multi-product lot scheduling problem in which defective items are produced in any production run of each product. We have adopted the common cycle scheduling policy and assumed that the setup times for production of each product can be non-zero. Further, we have assumed that defective items will be reworked and the inspection costs during the normal prod...
متن کاملBottlenecks in Production Lines with Rework: A Systems Approach
The bottleneck (BN) of a production system is a machine with the strongest effect on the system’s throughput. In this paper, a method for BN identification in serial lines with rework and Bernoulli machines is developed. In addition, the paper provides two system-theoretic results: First, it demonstrates that BNs may be shifting not only because of changes in machine and buffer parameters but a...
متن کاملlot sizing with rework and different inspection costs
this paper deals with the single machine multi-product lot scheduling problem in which defective items are produced in any production run of each product. we have adopted the common cycle scheduling policy and assumed that the setup times for production of each product can be non-zero. further, we have assumed that defective items will be reworked and the inspection costs during the normal prod...
متن کاملOptimum production and inspection modeling with minimal repair and rework considerations
This paper extends an integrated model of economic production quantity (EPQ) and preventive maintenance (PM) to incorporate possibilities of minimal repair and rework. Our model determines simultaneously the optimal number of inspections, the inspection interval, the EPQ, and the PM level. Numerical examples of Weibull shock models are given to show that allowing minimal repair and rework will ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Production Research
سال: 2010
ISSN: 0020-7543,1366-588X
DOI: 10.1080/00207540903469050