environmental risk assessment of gotvand-olia dam at operational phase using the integrated method of environmental failure mode and effects analysis (efmea) and preliminary hazard analysis

نویسندگان

سید علی جوزی

دانشیار گروه محیط زیست، دانشکدۀ فنی و مهندسی، دانشگاه آزاد اسلامی واحد تهران شمال سیده حمیده سیف السادات

کارشناس ارشد رشتۀ علوم محیط زیست، ارزیابی و آمایش سرزمین، دانشگاه آزاد اسلامی واحد علوم و تحقیقات خوزستان

چکیده

introduction gotvand-olia as one of the largest constructional projects in iran has been constructed on the karoun river, between masjed soleiman and gotvand regulatory dam in khuzestan province. it is situated in 382.8 km away from the river estuary at a distance of 25 km north of shoushtar city. this study was conducted to identify and assess the risk of gotvand-olia dam on the environment at the operational phase. as a part of the management of water resources, the dam is one of the most important structures playing a major role in the regulation of surface flows, especially in the areas that have poor spatial and temporal distribution of rainfalls. due to developments in dam construction in the world and particularly in iran, the need to assess the environmental impacts of dams is very important. environmental risk assessment is able to establish a relationship between the impacts of unwanted events with those that are not catastrophic. the quantitative risk assessment provides evident objectivity and transparency in the assessment of the impacts. material and methods the current study aims at assessing the risk of gotvand-olia dam at the operational phase. accordingly, after reviewing the relevant literatures, field studies, and interviewing with expertise and research team, a questionnaire was designed to identify the potential risks during the operational phase. according to the studies conducted in the field of dam risks in the world and particularly in iran as well as the technical and environmental reports on the gotvand-olia dam, the risk factors of the operational period were identified at first using the checklist of the pha method and were then assessed by efmea. in fmea, techniques to obtain have degrees of severity, probability, and extent of contamination. after obtaining, the three number can be calculated through the formula risk priority number (rpn)= severity of risk × event risk × extent of contamination. subsequently, a list of potential risk factors at the operational phase was included in the questionnaire and placed at disposal of the individuals who were expert on dam and environment. afterwards, considering the current situation of the study area, overall risk options at the operational phase (21 cases) were classified in the form of physicochemical, biological, socioeconomic, cultural, health-safety, and natural hazards using the pha checklist. to make a decision on acceptance or rejection of risks, statistical methods were applied to prioritize risk factors and specify their hazardous level due to lack of prioritization of the risks in efmea. accordingly, the high-level risks were identified. the study implementation of the risk assessment of the gotvand-oila was shown in the flow chart 1.   2.      risk screening by the pha check list     .identification for risks at the operational phase of the gotvand-oila dam   3.  risk assessment by the efmea method   4.  to analyze the risk level using spss software   5. determine risks of the level risk to provide risk control measures                     figure 1. study implementation of the risk assessment of the gotvand-oila   results and discussion according to the identified risks, it can be concluded that reservoir inundation, extraction of borrow materials, transportation of vehicles and machineries, recreation and tourism as well as construction of infrastructure facilities are hazardous activities at the operational phase. the risks at the operational phase of the gotvand-oila by the fmea method were shown in table 1. table 1. risks at the operational phase of the gotvand-oila by the fmea method level risk risk prior number risk series h 320 water salinization due to salt dome 1 h 288 erosion & sedimentation in downstream of the dam 2 h 256 generation of waste water and effluent by tourism & recreation 3 h 256 generation of solid waste by tourism & recreation 4 h 256 generation of waste water and in infrastructures 5 h 256 generation of solid waste and industrial waste in infrastructures 6 the obtained results suggest that the highest rpn equal to 320 belongs to water salinization occurred due to the existence of salt domes. while borrowing materials, the highest rpn (tantamount to 288) is belonged to erosion and sediment. the risk level is high. in transportation using vehicles and machineries, the highest rpn (equal to 216) is allocated to the vehicle exhaust emissions. the risk level is moderate. among tourism and recreational activities, the highest rpns were assigned to the generation of wastewater and effluent as well as solid waste, both with the same rpn of 256. the risk level is high. amongst activities related to the construction of infrastructures, the highest rpn (256) belongs to the generation of industrial wastewater and effluent. the risk level is high. a total number of 19 environmental risks were assessed and weighted by the efmea. afterwards, they were analyzed by spss software.  accordingly, upper and lower risk limits were determined 237.8 and 116, respectively. majority of the risks identified at the operational phase of the gotvand-olia dam can be classified in medium-level category which devoted itself to 58% of the whole. in this respect, the low (l) and high (h) level risk categories comprising 10% and 32% of total risks, respectively, have the lowest share. conclusion the highest rpn (320) belongs to water salinization occurred due to the dam inundation while the lowest rpn (90) is related to providing an appropriate environment for growth and reproduction of insects (anopheles) as well as soil compacting as a result of the agricultural development and the transportation of heavy machineries. the activity of gachsaran formation leads to the depletion of soil impregnated with salt to the river that its impacts can be characterized in terms of salinity, total dissolved solids (tds), total suspended solids (tss), and electrical conductivity (ec). given the importance of such a formation at the reservoir margins, the changes in the quality of river water at the operational phase can be justified. in this study, it is quite necessary to pay enough attention to the discharge of the karoun river as well as regional droughts. it is also necessary to consider a suitable place to dump soils containing salts extracted from upstream of the dam. in a second evaluation after the implementation of control and corrective measures, the highest risk of erosion and sedimentation downstream of the dam removal borrow materials (rpn= 168, a moderate risk level (m)) and the lowest risk is related to the oil spill equipment and the use of vehicles and machinery transporting operations (rpn=36, with a low risk level (l)). implementation of control and corrective measures of risks at the operational phase of gotvand-oila was shown in tabel 2. table 2. implementation of control and corrective measures of risks at the operational phase of the gotvand-oila corrective  measures risk estimation assessment ecologic risk by attention to the environment impacts of gachsaran formation. water salinization due to salt dome daily performance testing of water river quality. daily sampling and monitoring of water river quality. simulation erosion and salinization in the reservoir dam zone and precaution long time impacts. erosion & sedimentation in downstream                                          of the dam by removal borrow materials program codification for clearing and correction borrow materials excavated in the imam zadezaid zone. program codification for green space development in the site.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

the analysis of the role of the speech acts theory in translating and dubbing hollywood films

از محوری ترین اثراتی که یک فیلم سینمایی ایجاد می کند دیالوگ هایی است که هنرپیش گان فیلم میگویند. به زعم یک فیلم ساز, یک شیوه متأثر نمودن مخاطب از اثر منظوره نیروی گفتارهای گوینده, مثل نیروی عاطفی, ترس آور, غم انگیز, هیجان انگیز و غیره, است. این مطالعه به بررسی این مسأله مبادرت کرده است که آیا نیروی فراگفتاری هنرپیش گان به مثابه ی اعمال گفتاری در پنج فیلم هالیوودی در نسخه های دوبله شده باز تولید...

15 صفحه اول

the stady and analysis of rice agroclimatology in lenjan

the west of esfahan province, iran, is one of the most important agricultural areas throughout the country due to the climate variability and life-giving water of zayanderood river. rice is one of the major and economic crops in this area. the most important climatic elements in agricultural activities which should be considered include temperature, relative humidity, precipitation and wind. so...

15 صفحه اول

the differential effects of debate and media analysis as relate to enhancing efl learners critical thinking ability and writing performances

critical thinking ability has an important role in education. accordingly, scholars around the world are searching for new ways for teaching and improving students critical thinking ability. in line with the studies in efl contexts supporting the positive relationship between critical thinking and writing performances, this study investigated the differential effects of halverson’s critical thi...

15 صفحه اول

Environmental risk assessment of a dam during construction phase

The present study was conducted to assess the possible risks induced by construction of Gavi Dam in Ilam Province; western part of Iran, using MIKE-11 model and technique for order of preference by similarity to ideal solution. For this purpose, vulnerable zone of the dam site against the flooding risk of Gavi River was calculated for different return periods. The flooding zones were stimulated...

متن کامل

Environmental Risk Assessment of a Gas Power Plant Exploitation Unit Using Integrated TOP-EFMEA Method

Our study focuses on environmental risk assessment of a gas power plant in southern Iran. In this research, after investigating the different activities and processes of the power plant, potential harmful factors were initially identified. Afterwards, the identified risk factors were assessed and classified regarding the severity and probability of occurrence, possibility of recycling, and disp...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید


عنوان ژورنال:
محیط شناسی

جلد ۴۰، شماره ۱، صفحات ۱۰۷-۱۲۰

کلمات کلیدی
introduction gotvand olia as one of the largest constructional projects in iran has been constructed on the karoun river between masjed soleiman and gotvand regulatory dam in khuzestan province. it is situated in 382.8 km away from the river estuary at a distance of 25 km north of shoushtar city. this study was conducted to identify and assess the risk of gotvand olia dam on the environment at the operational phase. as a part of the management of water resources the dam is one of the most important structures playing a major role in the regulation of surface flows especially in the areas that have poor spatial and temporal distribution of rainfalls. due to developments in dam construction in the world and particularly in iran the need to assess the environmental impacts of dams is very important. environmental risk assessment is able to establish a relationship between the impacts of unwanted events with those that are not catastrophic. the quantitative risk assessment provides evident objectivity and transparency in the assessment of the impacts. material and methods the current study aims at assessing the risk of gotvand olia dam at the operational phase. accordingly after reviewing the relevant literatures field studies and interviewing with expertise and research team a questionnaire was designed to identify the potential risks during the operational phase. according to the studies conducted in the field of dam risks in the world and particularly in iran as well as the technical and environmental reports on the gotvand olia dam the risk factors of the operational period were identified at first using the checklist of the pha method and were then assessed by efmea. in fmea techniques to obtain have degrees of severity probability and extent of contamination. after obtaining the three number can be calculated through the formula risk priority number (rpn)= severity of risk × event risk × extent of contamination. subsequently a list of potential risk factors at the operational phase was included in the questionnaire and placed at disposal of the individuals who were expert on dam and environment. afterwards considering the current situation of the study area overall risk options at the operational phase (21 cases) were classified in the form of physicochemical biological socioeconomic cultural health safety and natural hazards using the pha checklist. to make a decision on acceptance or rejection of risks statistical methods were applied to prioritize risk factors and specify their hazardous level due to lack of prioritization of the risks in efmea. accordingly the high level risks were identified. the study implementation of the risk assessment of the gotvand oila was shown in the flow chart 1.   2.      risk screening by the pha check list     .identification for risks at the operational phase of the gotvand oila dam   3.  risk assessment by the efmea method   4.  to analyze the risk level using spss software   5. determine risks of the level risk to provide risk control measures                     figure 1. study implementation of the risk assessment of the gotvand oila   results and discussion according to the identified risks it can be concluded that reservoir inundation extraction of borrow materials transportation of vehicles and machineries recreation and tourism as well as construction of infrastructure facilities are hazardous activities at the operational phase. the risks at the operational phase of the gotvand oila by the fmea method were shown in table 1. table 1. risks at the operational phase of the gotvand oila by the fmea method level risk risk prior number risk series h 320 water salinization due to salt dome 1 h 288 erosion & sedimentation in downstream of the dam 2 h 256 generation of waste water and effluent by tourism & recreation 3 h 256 generation of solid waste by tourism & recreation 4 h 256 generation of waste water and in infrastructures 5 h 256 generation of solid waste and industrial waste in infrastructures 6 the obtained results suggest that the highest rpn equal to 320 belongs to water salinization occurred due to the existence of salt domes. while borrowing materials the highest rpn (tantamount to 288) is belonged to erosion and sediment. the risk level is high. in transportation using vehicles and machineries the highest rpn (equal to 216) is allocated to the vehicle exhaust emissions. the risk level is moderate. among tourism and recreational activities the highest rpns were assigned to the generation of wastewater and effluent as well as solid waste both with the same rpn of 256. the risk level is high. amongst activities related to the construction of infrastructures the highest rpn (256) belongs to the generation of industrial wastewater and effluent. the risk level is high. a total number of 19 environmental risks were assessed and weighted by the efmea. afterwards they were analyzed by spss software.  accordingly upper and lower risk limits were determined 237.8 and 116 respectively. majority of the risks identified at the operational phase of the gotvand olia dam can be classified in medium level category which devoted itself to 58% of the whole. in this respect the low (l) and high (h) level risk categories comprising 10% and 32% of total risks respectively have the lowest share. conclusion the highest rpn (320) belongs to water salinization occurred due to the dam inundation while the lowest rpn (90) is related to providing an appropriate environment for growth and reproduction of insects (anopheles) as well as soil compacting as a result of the agricultural development and the transportation of heavy machineries. the activity of gachsaran formation leads to the depletion of soil impregnated with salt to the river that its impacts can be characterized in terms of salinity total dissolved solids (tds) total suspended solids (tss) and electrical conductivity (ec). given the importance of such a formation at the reservoir margins the changes in the quality of river water at the operational phase can be justified. in this study it is quite necessary to pay enough attention to the discharge of the karoun river as well as regional droughts. it is also necessary to consider a suitable place to dump soils containing salts extracted from upstream of the dam. in a second evaluation after the implementation of control and corrective measures the highest risk of erosion and sedimentation downstream of the dam removal borrow materials (rpn= 168 a moderate risk level (m)) and the lowest risk is related to the oil spill equipment and the use of vehicles and machinery transporting operations (rpn=36 with a low risk level (l)). implementation of control and corrective measures of risks at the operational phase of gotvand oila was shown in tabel 2. table 2. implementation of control and corrective measures of risks at the operational phase of the gotvand oila corrective  measures risk estimation assessment ecologic risk by attention to the environment impacts of gachsaran formation. water salinization due to salt dome daily performance testing of water river quality. daily sampling and monitoring of water river quality. simulation erosion and salinization in the reservoir dam zone and precaution long time impacts. erosion & sedimentation in downstream                                          of the dam by removal borrow materials program codification for clearing and correction borrow materials excavated in the imam zadezaid zone. program codification for green space development in the site.