minimizing the sum of maximum earliness and tardiness on identical parallel machines scheduling problem

نویسندگان

قاسم مصلحی

مهندسی صنایع مهدی مهنام

مهندسی صنایع

چکیده

this paper addresses the problem of minimizing the sum of maximum earliness and tardiness on identical parallel machines scheduling problem. each job has a processing time and a due date. since this problem is trying to minimize and diminish the values of earliness and tardiness, the results can be useful for just–in-time production systems. it is shown that the problem is np-hard. using efficient lower and upper bounds and dominance rules based on adjacent pair-wise interchanges, a branch-and-bound algorithm is proposed. then, large sizes problems were solved by two evolutionary meta-heuristic algorithms, genetic algorithm and particle swarm optimization based on permutation and priority approaches. in order to evaluate the efficiency of the branch and bound algorithm, 1920 instances were randomly generated in small and medium sizes. also, the proposed heuristic and metaheuristic algorithms are then tested on 4880 randomly generated problems varying from small to large sizes. the results indicate that the branch & bound method is efficient in solving small and medium sized problems optimally with up to 20 jobs and 5 machines, and also the presented genetic algorithm is efficient in tackling problems of any size.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A comparison of algorithms for minimizing the sum of earliness and tardiness in hybrid flow-shop scheduling problem with unrelated parallel machines and sequence-dependent setup times

In this paper, the flow-shop scheduling problem with unrelated parallel machines at each stage as well as sequence-dependent setup times under minimization of the sum of earliness and tardiness are studied. The processing times, setup times and due-dates are known in advance. To solve the problem, we introduce a hybrid memetic algorithm as well as a particle swarm optimization algorithm combine...

متن کامل

Fuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flow Time through Genetic Algorithm

Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. One type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical model for...

متن کامل

Fuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flowtime through Genetic Algorithm

Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters with it, this is why in recent decades extensive researches have been done on scheduling issues. A type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical ...

متن کامل

fuzzy programming for parallel machines scheduling: minimizing weighted tardiness/earliness and flow time through genetic algorithm

appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. one type of scheduling problems is just-in-time (jit) scheduling and in this area, motivated by jit manufacturing, this study investigates a mathematical model for...

متن کامل

Scheduling on parallel identical machines to minimize total tardiness

This paper focuses on the problem of scheduling n independent jobs on m identical parallel machines for the objective of minimizing total tardiness of the jobs. We develop dominance properties and lower bounds, and develop a branch and bound algorithm using these properties and lower bounds as well as upper bounds obtained from a heuristic algorithm. Computational experiments are performed on r...

متن کامل

Minimizing Weighted Earliness and Tardiness on Parallel Machines Using a Multi-Agent System

The weighted earliness tardiness parallel machine scheduling problem is NP hard. It is herein approximately solved using a decentralized multi-agent system (MAS). MAS acts as a moderator of two types of agents: free jobs, and groups of jobs assigned to machines. MAS yields good solutions’ quality in reduced run times as evidenced by the computational results. Most importantly, it can be easily ...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید


عنوان ژورنال:
مهندسی صنایع

جلد ۴۴، شماره ۲، صفحات ۲۲۹-۲۴۲

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023