a transmission expansion planning model for maximizing merchant investment

نویسندگان
چکیده

0

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Fuzzy Multi Objective Programming Model for Power Generation and Transmission Expansion Planning Problem

The increasing consumption of electricity over time forces different countries to establishnew power plants and transmission lines. There are various crisp single-objective mathematicalmodels in the literature for the long-term power generation and transmission expansion planning tohelp the decision makers to make more reasonable decisions. But, in practice, most of the parametersassociated wit...

متن کامل

Regulatory Issues in Merchant Transmission Investment

Driven by fear of underinvestment in network assets, merchant investment in electricity transmission networks (MTI) is now legally allowed. Given that MTI is a real possibility, regulators face a new set of questions. After classifying different types of MTI, the paper raises and analyses regulatory questions, concentrating on the effect on competition, ownership questions, third-party-access r...

متن کامل

Transmission investment and expansion planning in a restructured electricity market

Transmission planning in a restructured electricity market becomes increasingly complicated. To bridge the gap between economic and engineering considerations, this survey paper suggests a framework to clarify the interactions among various economic and engineering issues by reviewing recent theoretical and practical progress in transmission investment and transmission planning methodology. Thu...

متن کامل

Toward a Combined Merchant-regulatory Mechanism for Electricity Transmission Expansion

Electricity transmission pricing and transmission grid expansion have received increasing regulatory and analytical attention in recent years. Since electricity transmission is a very special service with unusual characteristics, such as loop flows, the approaches have been largely tailor-made and not simply taken from the general economic literature or from the more specific but still general ...

متن کامل

A Multi-Year Scenario-Based Transmission Expansion Planning Model Incorporating Available Transfer Capability

This paper presents a multi-year scenario-based methodology for transmission expansion planning (TEP) in order to enhance the available transfer capability (ATC). The ATC is an important factor for all players of electricity market who participate in power transaction activities and can support the competition and nondiscriminatory access to transmission lines among all market participants. The...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید


عنوان ژورنال:
journal of electric power and energy conversion systems

جلد ۱، شماره ۱، صفحات ۸-۱۵

کلمات کلیدی

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023