applying genetic algorithm for an integrated supply and production/distribution planning in assembly systems

نویسندگان

محمد ثابت مطلق

دانشجوی دکتری مدیریت تولید و عملیات، دانشکدۀ مدیریت و حسابداری، دانشگاه علامه طباطبائی، تهران، ایران علی محقر

استاد گروه مدیریت صنعتی، دانشکدۀ مدیریت دانشگاه تهران، تهران، ایران

چکیده

abstract: an efficient supply chain system operates under a strategy to minimize costs by integrating the different functions inside the system and by meeting customer demands in time. in this paper, an integrated supply-production and distribution planning (spdp) is considered despite the fact that in most of the papers, part of the supply chain has been studied, not all parts. therefore, we develop a mathematical model that calculate the optimal inventory lot sizing for each supplier and minimize the total cost associated in the process of procuring raw material, transferring and holding raw materials, manufacturing and, finally, delivering the finished product. the problem is formulated as a pure integer programming and heuristic genetic algorithm (ga) method applied to solve it. then we test the proposed model in a case study conducted in iran. experimental results show that such a model can reduce the costs of the case study by 8/4694%.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Ordering Genetic Algorithm for Assembly Planning

Assembly sequence planning (ASP) aims to find an optimal sequence to assemble a product. We propose here to use the ordering genetic algorithms (OGA) to solve this problem. The approach is based on three main ideas. Firstly, the identification of the subassemblies in the sequence is done by keeping trace of the components membership to a set of parts all along the sequence. Secondly, precedence...

متن کامل

Optimisation of assembly scheduling in VCIM systems using genetic algorithm

Assembly plays an important role in any production system as it constitutes a significant portion of the lead time and cost of a product. Virtual computer-integrated manufacturing (VCIM) system is a modern production system being conceptually developed to extend the application of traditional computer-integrated manufacturing (CIM) system to global level. Assembly scheduling in VCIM systems is ...

متن کامل

An algorithm for integrated worker assignment, mixed-model two-sided assembly line balancing and bottleneck analysis

This paper addresses a multi-objective mixed-model two-sided assembly line balancing and worker assignment with bottleneck analysis when the task times are dependent on the worker’s skill. This problem is known as NP-hard class, thus, a hybrid cyclic-hierarchical algorithm is presented for solving it. The algorithm is based on Particle Swarm Optimization (PSO) and Theory of Constraints (TOC) an...

متن کامل

Meta-heuristic Algorithms for an Integrated Production-Distribution Planning Problem in a Multi-Objective Supply Chain

In today's globalization, an effective integration of production and distribution plans into a unified framework is crucial for attaining competitive advantage. This paper addresses an integrated multi-product and multi-time period production/distribution planning problem for a two-echelon supply chain subject to the real-world variables and constraints. It is assumed that all transportations a...

متن کامل

An Integrated Hydrocarbon Biofuel and Petroleum Supply Chain: Designing and Planning a Dynamic Supply Chain Network

One of the main challenges of bioenergy sector development is the cost of biomass supply chain resulted from inefficient bioenergy production from low energy content biomass feedstocks, high logistics costs of biomass production, handling and transportation. Another main aspect to be considered is that the configuration of a biofuel supply chain can be dynamic which evolve over time. Growing de...

متن کامل

An Integrated Approach for Facility Location and Supply Vessel Planning with Time Windows

This paper presents a new model of two-echelon periodic supply vessel planning problem with time windows mix of facility location (PSVPTWMFL-2E) in an offshore oil and gas industry. The new mixed-integer nonlinear programming (MINLP) modelconsists ofa fleet composition problem and a location-routing problem (LRP). The aim of the model is to determine the size and type of large vessels in the fi...

متن کامل

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023