a mathematical model for a flow shop scheduling problem with fuzzy processing times
نویسندگان
چکیده
this paper presents a mathematical model for a flow shop scheduling problem consisting of m machine and n jobs with fuzzy processing times that can be estimated as independent stochastic or fuzzy numbers. in the traditional flow shop scheduling problem, the typical objective is to minimize the makespan). however,, two significant criteria for each schedule in stochastic models are: expectable makespan and the probability of minimizing the makespan. these criteria can be considered for fuzzy problems as well. in this paper, we propose a solution for the fuzzy model by the use of fuzzy logic based on developing the model presented by maccahon [18].
منابع مشابه
منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
journal of optimization in industrial engineeringناشر: qiau
ISSN 2251-9904
دوره Volume 2
شماره Issue 3 2010
کلمات کلیدی
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023