Block transportation scheduling under delivery restriction in shipyard using meta-heuristic algorithms
نویسندگان
چکیده
Special vehicles called transporters are used to deliver heavy blocks from one plant to another in shipyards. Because of the limitation on the number of transporters, the scheduling of transporters is important for maintaining the overall production schedule of the blocks. This paper considers a scheduling problem of block transportation under a delivery restriction to determine when and by which transporter each block is delivered from its source plant to its destination plant. The objective of the problem is to minimize the penalty times that can cause delays in the overall block production schedule. A mathematical model for the optimal solution is derived, and two meta-heuristic algorithms based on a genetic algorithm (GA) and a self-evolution algorithm (SEA) are proposed. The performance of the algorithms is evaluated with several randomly generated experimental examples. 2013 Published by Elsevier Ltd.
منابع مشابه
MULTI-OBJECTIVE ROUTING AND SCHEDULING IN FLEXIBLE MANUFACTURING SYSTEMS UNDER UNCERTAINTY
The efficiency of transportation system management plays an important role in the planning and operation efficiency of flexible manufacturing systems. Automated Guided Vehicles (AGV) are part of diversified and advanced techniques in the field of material transportation which have many applications today and act as an intermediary between operating and storage equipment and are routed and contr...
متن کاملNo-idle time Scheduling of Open shops: Modeling and Meta-heuristic Solution Methods
In some industries as foundries, it is not technically feasible to interrupt a processor between jobs. This restriction gives rise to a scheduling problem called no-idle scheduling. This paper deals with scheduling of no-idle open shops to minimize maximum completion time of jobs, called makespan. The problem is first mathematically formulated by three different mixed integer linear programming...
متن کاملProject scheduling optimization for contractor’s Net present value maximization using meta-heuristic algorithms: A case study
Today's competitive conditions have caused the projects to be carried out in the least possible time with limited resources. Therefore, managing and scheduling a project is a necessity for the project. The timing of a project is to specify a sequence of times for a series of related activities. According to their priority and their latency, so that between the time the project is completed and ...
متن کاملMeta-heuristic Algorithms for an Integrated Production-Distribution Planning Problem in a Multi-Objective Supply Chain
In today's globalization, an effective integration of production and distribution plans into a unified framework is crucial for attaining competitive advantage. This paper addresses an integrated multi-product and multi-time period production/distribution planning problem for a two-echelon supply chain subject to the real-world variables and constraints. It is assumed that all transportations a...
متن کاملFinite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups
This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (FFL) and delivers them directly to an assembly facility (AF). The objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage....
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Expert Syst. Appl.
دوره 41 شماره
صفحات -
تاریخ انتشار 2014