A Proposal for the Improvement of Project's Cost Predictability using Earned Value Management and Historical Data of Cost - An Empirical Study
نویسندگان
چکیده
This paper proposes an extension of the EVM technique through the integration of historical cost performance data of processes as a means to improve the predictability of projects cost. The proposed technique was evaluated through an empirical study, which evaluated the implementation of the proposed technique in 17 software development projects. The proposed technique has been applied in real projects with the aim of evaluating the accuracy and variation of the CPIAcum and consequently the EAC. Then it was compared to the traditional technique. Hypotheses tests with 90% significance level were performed, and the proposed technique was more accurate and more stable (less variation) than the traditional technique for calculating the Cost Performance Index CPI and the Estimates at Completion EAC.
منابع مشابه
تعیین ضریب عملکرد پروژه در مدیریت ارزش کسب شده با استفاده از مدیریت ریسک به منظور تخمین نتایج پایانی کار پیمانکاران
One of the common questions in all projects, is "How much would be the final cost of the project?" or "How much would be the completion duration of the project?". Earned Value Management presents a method for estimation of these results. In general methods and formula of Earned Value Management, future trend of project, are anticipated completely based on its previous trend, and changes in envi...
متن کاملForecasting Final Schedule and Cost of Projects by Using Statistical and Mathematical Method
Earned value management (EVM) has prepared some methods to forecast final costs of projects. These methods were not developed since the start of formation and were gradually completed, of course with one exception that is its authenticity, they are still remained unchanged. At the present time EVM guide does not apply from schedule indices to forecast schedule for completion of project and ...
متن کاملProject Time and Cost Forecasting using Monte Carlo simulation and Artificial Neural Networks
The aim of this study is to present a new method to predict project time and cost under uncertainty. Assuming that what happens in projects implementation which is expressed in the form of Earned Value Management (EVM) indicators is primarily related to the nature of randomness or unreliability, in this study, by using Monte Carlo simulation, and assuming a specific distribution for the time an...
متن کاملEstimation of Project Performance Using Earned Value Management and Fuzzy Regression
Earned Value Management is a critical project managementmethodology that evaluates project performance from cost andschedule viewpoints. The novel theoretical framework presented in thispaper estimates future performance of project regarding the past relativeinformation. It benefits from fuzzy regression (FR) models in estimationprocess in order to deal with the vagueness and impreciseness ofre...
متن کاملPredicting project time and costs using earned value management based on trapezoidal fuzzy numbers
Projects include activities that must be carried out at certain dates, with specified costs and determined qualities in order to satisfy the stakeholders. Project control is one of the most important and widely used issues in project-based organizations and it has attracted a lot of attention. So far, in the field of project control, there have been a lot of research that were done in different...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- International Journal of Software Engineering and Knowledge Engineering
دوره 25 شماره
صفحات -
تاریخ انتشار 2014