An exact algorithm for the maximum stable set problem

نویسندگان

  • Carlo Mannino
  • Antonio Sassano
چکیده

We describe a new branch-and-bound algorithm for the exact solution of the maximum cardinality stable set problem. The bounding phase is based on a variation of the standard greedy algorithm for finding a colouring of a graph. Two different node-fixing heuristics are also described. Computational tests on random and structured graphs and very large graphs corresponding to 'real-life' problems show that the algorithm is competitive with the fastest algorithms known so far.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Exact Algorithm for the Mode Identity Project Scheduling Problem

In this paper we consider the non-preemptive variant of a multi-mode resource constrained project scheduling problem (MRCPSP) with mode identity, in which a set of project activities is partitioned into disjoint subsets while all activities forming one subset have to be processed in the same mode. We present a depth-first branch and bound algorithm for the resource constrained project schedulin...

متن کامل

An employee transporting problem

An employee transporting problem is described and a set partitioning model is developed. An investigation of the model leads to a knapsack problem as a surrogate problem. Finding a partition corresponding to the knapsack problem provides a solution to the problem. An exact algorithm is proposed to obtain a partition (subset-vehicle combination) corresponding to the knapsack solution. It require...

متن کامل

An Algorithm based on Predicting the Interface in Phase Change Materials

Phase change materials are substances that absorb and release thermal energy during the process of melting and freezing. This characteristic makes phase change material (PCM)  a favourite choice to integrate it in buildings. Stephan problem including melting and solidification in PMC materials is an practical problem in many engineering processes. The position of the moving boundary, its veloci...

متن کامل

An Optimum Algorithm for Single Machine with Early/Tardy Cost

The problem of determining the sequence of a set of jobs with the objective function of minimizing the maximum earliness and tardiness in one machine is studied. &#10 Production systems like JIT are one of the many applications of the problem. This problem is studied in special cases and their optimal solutions are introduced with simple orders. In general, some effective conditions for ne...

متن کامل

An Optimum Algorithm for Single Machine with Early/Tardy Cost

The problem of determining the sequence of a set of jobs with the objective function of minimizing the maximum earliness and tardiness in one machine is studied. Production systems like JIT are one of the many applications of the problem. This problem is studied in special cases and their optimal solutions are introduced with simple orders. In general, some effective conditions for neig...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Comp. Opt. and Appl.

دوره 3  شماره 

صفحات  -

تاریخ انتشار 1994