The construction of stable project baseline schedules

نویسندگان

  • Willy Herroelen
  • Roel Leus
چکیده

The vast majority of project scheduling efforts assume complete information about the scheduling problem to be solved and a static deterministic environment within which the pre-computed baseline schedule will be executed. In reality, however, project activities are subject to considerable uncertainty, which generally leads to numerous schedule disruptions. It is of interest to develop pre-schedules that can absorb disruptions in activity durations without affecting the planning of other activities, such that coordination of resources and material procurement for each of the activities can be performed as smoothly as possible. The objective of this paper is to develop and evaluate various approaches for constructing a stable pre-schedule, which is unlikely to undergo major changes when it needs to be repaired as a reaction to minor activity duration disruptions.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Developing Robust Project Scheduling Methods for Uncertain Parameters

A common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. As a result, project managers are often unable to meet the deadline time of the milestones. Robust project scheduling is an effective approach in case of uncertainty. Upon adopting this approach, schedules are protected against po...

متن کامل

Construction scheduling using Genetic Algorithm based on Building Information Model

This is a PDF file of an unedited manuscript that has been accepted for publication. As a service to our customers we are providing this early version of the manuscript. The manuscript will undergo copyediting, typesetting, and review of the resulting proof before it is published in its final form. Please note that during the production process errors may be discovered which could affect the co...

متن کامل

Heuristic procedures for generating stable project baseline schedules

Solution robust project scheduling is a growing research field aiming at constructing proactive schedules to cope with multiple disruptions during project execution. When stochastic activity durations are considered, including time buffers between activities is a proven method to improve the stability of a baseline schedule. This paper introduces multiple algorithms to include time buffers in a...

متن کامل

The Relationship between Intellectual Capital and Project Managers Competencies by Using Structural Equation: CFA

This study was aimed at developing a method for measuring the relationship between intellectual capital and project manager competencies. Intellectual capital consist human capital, structural capital and relational capital. Project manager competencies have been evaluated based on IPMA Competence Baseline (ICB) and Project Manager Competency Development Framework (PMCDF) includes knowledge, sk...

متن کامل

Proactive Project Scheduling with a Bi-Objective Genetic Algorithm in an R&D Department

During project execution, especially in a multi-project environment unforeseen events arise that disrupt project plans resulting in deviations of project plans and budgets due to missed due dates and deadlines, resource idleness, higher work-in-process inventory and increased system nervousness. Therefore, project schedules should also include solution robustness to cope with the uncertainties ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • European Journal of Operational Research

دوره 156  شماره 

صفحات  -

تاریخ انتشار 2004