Selecting a Project 's Methodology

نویسنده

  • Alistair Cockburn
چکیده

0 7 4 0 7 4 5 9 / 0 0 / $ 1 0 . 0 0 © 2 0 0 0 I E E E The punch line is that having multiple methodologies is appropriate and necessary. We can differentiate them according to staff size and system criticality (more dimensions exist, but these two serve well initially). For any point in the size–criticality space, methodology designers select a scope of concerns, prioritizing some quality of the project. Based on these choices, the project team selects how light or heavy a methodology they want for their project. (See the “Vocabulary” sidebar for a discussion of methodology weight and other pertinent terms.) To help software development teams handle the selection, I describe several principles that underlie methodology design. I have successfully used these principles on several software development projects, one of which I describe in some detail in this article.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

APPLICATION OF DEA FOR SELECTING MOST EFFICIENT INFORMATION SYSTEM PROJECT WITH IMPRECISE DATA

The selection of best Information System (IS) project from many competing proposals is a critical business activity which is very helpful to all organizations. While previous IS project selection methods are useful but have restricted application because they handle only cases with precise data. Indeed, these methods are based on precise data with less emphasis on imprecise data. This paper pro...

متن کامل

A Conceptual Methodology for Transportation Projects Selection

  Selection of appropriate infrastructure transportation projects such as highways, plays an important role in promotion of transportation systems. Usually in evaluation of transportation projects, because of lack of information or due to long time and high expenditures needed for gathering information, different effective factors are ignored. Thus, in this research, regarding multi criteria na...

متن کامل

Determining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)

Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...

متن کامل

Rule Based Expert System for Selecting Software Development Methodology

Software development methodology is a formalized approach that is used to plan and manage the process of developing a software system. Since there are many software development methodologies, one of the challenges faced by software developers is to decide which methodology to apply in a software project. This paper presents the modeling and development of a prototype expert system that helps so...

متن کامل

A Model for Project Selecting with Limited Resources in Data Envelopment Analysis with Input and Output Fuzzy

In Evaluating Performance, Selecting a Subset from a Set of Solutions with Limited Resources is Essential. If There Is More Than One Input and Output, the Data Rnvelopment Analysis Optimization Models Are Evaluated and Performance Measurement Based on the Weighted Output Is Divided Weighted Input. In This Research, Two Models of Optimization with Limited Resources Present from Data Envelopment ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • IEEE Software

دوره 17  شماره 

صفحات  -

تاریخ انتشار 2000