Planning Complex Engineer-to-order Products

نویسندگان

  • Christopher Earl
  • Dong Ping Song
  • Christian Hicks
چکیده

The design and manufacture of complex Engineer-to-Order products is characterised by uncertain operation durations, finite capacity resources and multilevel product structures. Two scheduling methods are presented to minimise expected costs for multiple products across multiple finite capacity resources. The first sub-optimises the operations sequence, using mean operation durations, then refines the schedule by perturbation. The second method generates a schedule of start times directly by random search with an embedded simulation of candidate schedules for evaluation. The methods are compared for industrial examples.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Proof Planning and Industrial Configuration

The problem of configuration is a complex industrial issue. It has been shown in the past that considerable amounts of labour were spent on problems connected with manufacturing based decisions. Planning and scheduling, design and configuration, logistics and resource management are representative examples. In the case where the complexity of products to be manufactured is getting more flexible...

متن کامل

Key Findings to Support the Development of a Framework for the Implementation of Product Lifecycle Management in Engineer to Order Products

BAE Systems Naval Ships has undertaken a comprehensive overhaul of all aspects of its approach to the engineering, design and manufacture of complex warships. Through a partnership with the University of Strathclyde, research has been completed on the implementation of Product Lifecycle Management (PLM) to meet organisational objectives in the development of Engineer to Order (ETO) products. En...

متن کامل

Computer-aided production management issues in the engineer-to-order production of complex capital goods explored using a simulation approach

This paper describes the exploration of manufacturing planning and control issues in the capital goods industry using a simulation approach. The companies produce products which have deep and complex product structures and are produced in low volume on an engineeror make-to-order basis (ETO, MTO). The work reported here draws on the results of surveys of companies involved in the manufacture of...

متن کامل

A Multi-Period Robust Optimization Model for Integrated Planning of Decisions in the Petrochemical Products’ Supply Chain

  Optimal management and planning in the petrochemical industry will bring about many economic benefits, including depended industries. In this research we examine technical and operational planning in the petrochemical supply chain network to assess how to optimize periodic decisions such as inventory of raw materials and products, pricing, transportation and flow of materials and products. In...

متن کامل

How to analyze and quantify similarities between configured engineer to order products by comparing the highlighted features utilizing the configuration system abilities

1 Engineering-To-Order (ETO) companies making complex and highly engineered products, face the challenge of delivering highly customized and engineered products with high quality and short delivery time. In order to respond to those challenges ETO companies strive to increase commonality between different projects and to reuse product related information. For that purpose companies need to be...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010