Spiral2 Accelerator Construction Progress

نویسنده

  • P. Bertrand
چکیده

The installation of the SPIRAL2 superconducting accelerator at GANIL is almost started. All the major components have been tested in the various partner laboratories, and the building construction is now well engaged. The management of the interfaces between the process and the buildings is a strategic point in an underground accelerator, with strong space constraints. This paper describes the performances of the various components.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Status of the Construction of the Spiral2 Accelerator at Ganil

The Driver Accelerator for the SPIRAL2 Radioactive Ion Beam facility at GANIL (Caen, France) is in the construction phase. Following the initial phase of prototyping development, the series production of major components was recently launched. Important decisions have also been recently taken concerning buildings, RIB operational aspects and related safety requirements.

متن کامل

The Advancement of Spiral 2 Project

After a detailed design study phase (2003-2004), the SPIRAL2 project at GANIL (Caen, France) was officially approved in May 2005, and is now in its phase of construction, with a project group in which many French laboratories (CEA,CNRS) and international partners are participants. The SPIRAL2 facility is composed of a multi-beam driver accelerator (5mA/40Mev deuterons, 5mA/33Mev protons, 1mA/14...

متن کامل

Assembling, Testing and Installing the Spiral2 Superconducting Linac

Assembly and tests of the SPIRAL2 superconducting linac's components are now proceeding smoothly. Cryomodules are being processed in CEA Saclay and IPN Orsay, inter-cryomodules "warm" sections in GANIL. While installation of the accelerators components is going on in the new SPIRAL2 building in Caen, installation of the cryomodules will begin during the last quarter of 2013. The latest results ...

متن کامل

Status and Challenges of the Spiral2 Facility

SPIRAL2 is a new European Radioactive Ion Beams facility being constructed at the GANIL laboratory (Caen, France). It is based on a High Intensity CW multi-ion Accelerator Driver (Superconducting Linac), delivering beams to a High Power Production system (converter, target, and ion source), producing and post-accelerating Radioactive Ion Beams with intensities never reached before. The major co...

متن کامل

Progress Report on the Stanford Linear Accelerator Center ”

This report describes some of the highlights of the present state of construction of the Stanford 20 GeV Linear Accelerator. Comprehensive descriptions, statistics and specifications of the two-mile line1ar electron accelerator have been given on numerous other occasions and will not be included here. By the nature of progress in our construction schedule, hopefully a substantial fraction of th...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013