Simultaneous control of production, repair/replacement and preventive maintenance of deteriorating manufacturing systems

نویسندگان

  • F. I. Dehayem Nodem
  • J. P. Kenné
  • A. Gharbi
چکیده

This paper presents a method to find the optimal production, repair/replacement and preventive maintenance policies for a degraded manufacturing system. The system is subject to random machine failures and repairs. The status of the system is deemed to degrade with repair activities. When a failure occurs, the machine is either repaired or replaced, and a replacement action renews the machine, while a repair action brings it to a degraded operational state, with the next repair time increasing as the number of repairs increases as well. A preventive maintenance action is considered in order to improve the reliability of the machine, thereby reducing the amount of disruptions caused by machine failures. The decision variables are the production rate, the preventive maintenance rate and the repair/ replacement switching policy upon machine failure. The objective of the study is to find the decision variables that minimize the overall cost, including repair, replacement, preventive maintenance, inventory holding and backlog costs over an infinite planning horizon. The proposed model is based on a semi-Markov decision process, and the stochastic dynamic programming method is used to obtain the optimality conditions. A numerical example is given to illustrate the proposed model, and a sensitivity analysis is considered in order to confirm the structure of the control policy and to illustrate the usefulness of the proposed approach. & 2011 Elsevier B.V. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Modelling and Decision-making on Deteriorating Production Systems using Stochastic Dynamic Programming Approach

This study aimed at presenting a method for formulating optimal production, repair and replacement policies. The system was based on the production rate of defective parts and machine repairs and then was set up to optimize maintenance activities and related costs. The machine is either repaired or replaced. The machine is changed completely in the replacement process, but the productio...

متن کامل

Preventive maintenance and replacement policies for deteriorating production systems

This paper presents a special case of integration of the preventive maintenance into the repair/replacement policy of a failure-prone system. The machine of the considered system exhibits increasing failure intensity and increasing repair times. To reduce the failure rate and subsequent repair times following a failure, there is an incentive to perform preventive maintenance on the machine befo...

متن کامل

A Survey of Preventive Maintenance Planning Models, Techniques and Policies for an Ageing and Deteriorating Production Systems

I n the past many decades, breakdown, maintenance and replacement issues of deteriorating machines and systems are extensively studied within the literature. A number of maintenance and replacement models, techniques and policies are created, documented and tested. However, of these models are comprised of some classes ∗M.Tech. Student, Department of Mechanical Engineering, Madhav Institute of ...

متن کامل

Adaptive policy of buffer allocation and preventive maintenance actions in unreliable production lines

The buffer allocation problem is an NP-hard combinatorial optimization problem, and it is an important design problem in manufacturing systems. The research proposed in this paper concerns a product line consisting of n unreliable machines with n − 1 buffers and a preventive maintenance policy. The focus of the research is to obtain a better trade-off between the buffer level ...

متن کامل

An integrated production and preventive maintenance planning model with imperfect maintenance in multi-state system

Production planning and maintenance are two important problems in manufacturing systems. Despite the relationship exists between these two problems due to sudden failures and production capacity occupied by maintenance activities, each of these problems planned separately and as a result program and model efficiencies reduce in the real world. The aim of integrated production and maintena...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015