Search Strategies for Scheduling Problems with Optional Activities

نویسنده

  • Roman Barták
چکیده

Scheduling problems typically deal with activity sequencing and resource allocation while the problem of activity selection is assumed to be resolved before scheduling. To increase flexibility of scheduling systems in complex environments, it is possible to include activity selection, for example decisions about alternative process routes, in the scheduling problem. This could be realized by assuming optional activities in the problem specification. Constraint-based scheduling seems to be a good underlying technology to model problems both with traditional scheduling decisions such as activity sequencing and resource allocation, and with planning-like decisions such as selection among alternative activities. The paper studies search strategies for solving scheduling problems with optional activities – the search procedure assumes both sequencing decisions and selection among alternative activities.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A heuristic approach for multi-stage sequence-dependent group scheduling problems

We present several heuristic algorithms based on tabu search for solving the multi-stage sequence-dependent group scheduling (SDGS) problem by considering minimization of makespan as the criterion. As the problem is recognized to be strongly NP-hard, several meta (tabu) search-based solution algorithms are developed to efficiently solve industry-size problem instances. Also, two different initi...

متن کامل

Efficient Edge-Finding on Unary Resources with Optional Activities

Unary resources play a central role in modelling scheduling problems. Edge-finding is one of the most popular techniques to deal with unary resources in constraint programming environments. Often it depends on external factors if an activity will be included in the final schedule, making the activity optional. Currently known edge-finding algorithms cannot take optional activities into account....

متن کامل

A multi Agent System Based on Modified Shifting Bottleneck and Search Techniques for Job Shop Scheduling Problems

This paper presents a multi agent system for the job shop scheduling problems. The proposed system consists of initial scheduling agent, search agents, and schedule management agent. In initial scheduling agent, a modified Shifting Bottleneck is proposed. That is, an effective heuristic approach and can generate a good solution in a low computational effort. In search agents, a hybrid search ap...

متن کامل

Robust Local Search for Solving RCPSP/max with Durational Uncertainty

Scheduling problems in manufacturing, logistics and project management have frequently been modeled using the framework of Resource Constrained Project Scheduling Problems with minimum and maximum time lags (RCPSP/max). Due to the importance of these problems, providing scalable solution schedules for RCPSP/max problems is a topic of extensive research. However, all existing methods for solving...

متن کامل

Incremental Propagation Rules for Precedence Graph with Optional Activities and Time Windows

Constraint-based scheduling is a powerful tool for solving real-life scheduling problems thanks to a natural integration of special solving algorithms encoded in global constraints. The filtering algorithms behind these constraints are based on propagation rules modelling some aspects of the problems, for example a unary resource. This paper describes new incremental propagation rules integrati...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008