The Static Stochastic Ground Holding Problem with Aggregate Demands

نویسندگان

  • Michael O. Ball
  • Robert Ho
  • Amedeo Odoni
  • Ryan Rifkin
چکیده

The ground delay program is a mechanism used to decrease the rate of incoming ights into an airport when it is projected that arrival demand into the airport will exceed capacity. In this paper, we present an integer programming model for planning ground delay programs. The model considers a stochastic capacity pro le which is represented by a set of airport capacity scenarios and their probabilities. Both the demand on the airport and the output of the model are represented at an aggregate level in terms of numbers of ights per unit time. This allows the model to be used in conjunction with arbitrarily complex processes for allocating individual ights to slots. It was speci cally designed to be used in the Collaborative Decision Making setting where individual ight assignments result from an iterative process involving both the airlines and tra c ow managers. We show that the linear programming dual of the model can be transformed into a network ow problem. This implies that the integer program can be solved e ciently using linear programming or network ow methods. 2

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Vendor Managed Inventory of a Single-vendor Multiple-retailer Single-warehouse Supply Chain under Stochastic Demands

In this study, a vendor-managed inventory model is developed for a single-vendor multiple-retailer single-warehouse (SV-MR-SV) supply chain problem based on the economic order quantity in which demands are stochastic and follow a uniform probability distribution. In order to reduce holding costs and to help balanced on-hand inventory cost between the vendor and the retailers, it is assumed that...

متن کامل

Performance Analysis of Dynamic and Static Facility Layouts in a Stochastic Environment

In this paper, to cope with the stochastic dynamic (or multi-period) problem, two new quadratic assignment-based mathematical models corresponding to the dynamic and static approaches are developed. The product demands are presumed to be dependent uncertain variables with normal distribution having known expectation, variance, and covariance that change from one period to the next one, randomly...

متن کامل

Competitive Vehicle Routing Problem with Time Windows and Stochastic Demands

The competitive vehicle routing problem is one of the important issues in transportation area. In this paper a new method for competitive VRP with time windows and stochastic demand is introduced. In the presented method a three time bounds are given and the probability of arrival time between each time bound is assumed to be uniform. The demands of each customer are different in each time wind...

متن کامل

Using Greedy Clustering Method to Solve Capacitated Location-Routing Problem with Fuzzy Demands

Using Greedy Clustering Method to Solve Capacitated Location-Routing Problem with Fuzzy Demands Abstract In this paper, the capacitated location routing problem with fuzzy demands (CLRP_FD) is considered. In CLRP_FD, facility location problem (FLP) and vehicle routing problem (VRP) are observed simultaneously. Indeed the vehicles and the depots have a predefined capacity to serve the customerst...

متن کامل

Ground holding strategies for air traffic control under uncertainty

As air traffic congestion grows, ground-holding (or "gate-holding") of aircraft is becoming increasingly common. Ground-holding is the practice of delaying the departure of a flight due to anticipated congestion at the airport of destination, because it is both less expensive and safer, for aircraft to wait on the ground, prior to take-off, than in the air. The problem of developing strategies ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1999