Construction of Articulated Models from Range Data
نویسندگان
چکیده
In this paper we present an algorithm for automatically building models of articulated objects from range data. These models not only describe the surface shape of the object but also describe the kinematics that constrain the movement of one object component in relation to another. This is more diicult than building models of rigid objects because the association of surface measurements to object components must be determined. The algorithm is demonstrated on a diicult object with free-form surfaces.
منابع مشابه
Segmentation of Range Data into Rigid Subsets Using Surface Patches
In this paper we consider one aspect of the problem of automatically constructing geometric models of articulated objects from multiple range images. Automatic model construction has been investigated for rigid objects, but the techniques used do not extend easily to the articulated case. The problem arises because of the need to register surface measurements taken from different viewpoints int...
متن کاملSegmentation of Range Data into Rigid Subsets using Planar Surface Patches
In this paper we consider one issue of the problem of automatically constructing geometric models of articulated objects from multiple range images. Automatic model construction has been investigated for rigid objects, but the techniques used do not extend easily to the articulated case. The problem arises because of the need to register surface measurements taken from diierent viewpoints into ...
متن کاملConstructing Models of Articulating Objects: Range Data Partitioning
In this paper we consider one aspect of the problem of automatically building shape models of articulating objects from example range images. Central to the model construction problem is the registration of range data, taken from different vantage points, into a common coordinate frame. This involves determining a transformation for each set of range data which aligns overlapping surface points...
متن کاملEvaluting of Kaboodval dam during construction using finite clement method with software PLAXIS and a comparison with the actual values of instrumentation data
In this study, based on data from instrumentation Kaboodval earth dam, pore pressure, stresses and the meeting of the dam construction period compared with the values of numerical analysis. For this purpose, during the construction of the dam using Mohr-Coulomb model behavior, the softening, hardening model has been analyzed and pore pressure, stresses in the body and its meeting with instrum...
متن کاملConstruction cost estimation of spherical storage tanks: artificial neural networks and hybrid regression—GA algorithms
One of the most important processes in the early stages of construction projects is to estimate the cost involved. This process involves a wide range of uncertainties, which make it a challenging task. Because of unknown issues, using the experience of the experts or looking for similar cases are the conventional methods to deal with cost estimation. The current study presents data-driven metho...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 1999