A Concave-Cost Production Planning Problem with Remanufacturing Options

نویسندگان

  • Jian Yang
  • Boaz Golany
  • Gang Yu
چکیده

We focus on the concave-cost version of a production planning problem where a manufacturer can meet demand by either producing new items or by remanufacturing used items. Unprocessed used items are disposed. We show the NP-hardness of the problem even when all the costs are stationary. Utilizing the special structure of the extreme-point optimal solutions for the minimum concave-cost problem with a network flow type feasible region, we develop a polynomial-time heuristic for the problem. Our computational study indicates that the heuristic is a very efficient way to solve the problem as far as solution speed and quality are concerned. © 2005 Wiley Periodicals, Inc. Naval Research Logistics 52: 443–458, 2005.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Dynamic Multi Period Production Planning Problem with Semi Markovian Variable Cost (TECHNICAL NOTE)

This paper develops a method for solving the single product multi-period production-planning problem, in which the production and the inventory costs of each period arc concave and backlogging is not permitted. It is also assumed that the unit variable cost of the production evolves according to a continuous time Markov process. We prove that this production-planning problem can be Stated as a ...

متن کامل

Two-Period Inventory Control with Manufacturing and Remanufacturing under Return Compensation Policy

As an effective way of decreasing production cost, remanufacturing has attracted more and more attention from firms. However, it also brings many difficulties to firms, especial when firms remanufacture products which they produce. A primary problem for the case is how to acquire the used product sold by the firm itself. In this paper, we consider a return compensation policy for acquiring used...

متن کامل

On the complexity of the economic lot-sizing problem with remanufacturing options

In this paper we investigate the complexity of the economic lot-sizing problem with remanufacturing (ELSR) options. Whereas in the classical economic lot-sizing problem demand can only be satisfied by production, in the ELSR problem demand can also be satisfied by remanufacturing returned items. Although the ELSR problem can be solved efficiently for some special cases, we show that the problem...

متن کامل

A Capacitated Production Planning Problem for Closed-Loop Supply Chain

This paper addresses a dynamic Capacitated Production Planning (CPP) problem in steel enterprise employing a closed-loop supply chain strategy, in which a remanufacturing process is adopted. We develop a model in which all demands are met by production or remanufacturing without backlogs, under the context that both the production and remanufacturing setup cost functions are arbitrary and time-...

متن کامل

Determination of Criticality Indexes in the Remanufacturing Process: A GERT-based Simulation Approach

In this paper one of the important “end of life options” (remanufacturing) has been analysed. Among the related studies surveyed the various remanufacturing aspects, less attention has been paid to the stochastic process routing. In this regard, a remanufacturing process routing with stochastic activities is modelled as a GERT network. One of the efficient ways to analyse a remanufacturing proc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005