Heuristic methods for cost-oriented assembly line balancing: A comparison on solution quality and computing time

نویسنده

  • Matthias Amen
چکیده

This paper is focused on the solution quality and computing time requirements of heuristic methods for cost-oriented assembly line balancing. It is based on a recent paper (Amen, International Journal of Production Economics 68 (2000), which describes in detail the solution process of existent and two new heuristics. After a short review of the historic origin and the wideness of assembly line systems in present day industry, the paper emphasizes the economic view of production in order to cut down production cost. Results of a worst-case analysis concerning the solution quality and the computing time are presented. An interval for the worst-case-solution quality for most heuristic methods is given. The results of an experimental investigation show that the new priority rule `best change of idle costa (Amen) achieves signi"cantly better solutions than the existent priority rules. Furthermore, the new method `exact solution of sliding problem windowsa (Amen) has been found to be the best heuristic method known so far. ( 2001 Elsevier Science B.V. All rights reserved.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A cost-oriented model for multi-manned assembly line balancing problem

In many real world assembly line systems which the work-piece is of large size more than one worker work on the same work-piece in each station. This type of assembly line is called multi-manned assembly line (MAL). In the classical multi-manned assembly line balancing problem (MALBP) the objective is to minimize the manpower needed to manufacture one product unit. Apart from the manpower, othe...

متن کامل

مدلی جدید برای حل مساله موازنه خط مونتاژ هزینه‌گرا

 In this research, a new model for cost-oriented assembly line balancing problem has been presented that consists of labour and equipment cost. The approach of this model for these costs is coincided with real condition of assembly lines and yield possibility of using common equipment amoung tasks. The objective function and constrains of this model has been shown by mathematical relations and ...

متن کامل

Assembly line balancing to minimize balancing loss and system loss

Assembly Line production is one of the widely used basic principles in production system. The problem of Assembly Line Balancing deals with the distribution of activities among the workstations so that there will be maximum utilization of human resources and facilities without disturbing the work sequence. Research works reported in the literature mainly deals with minimization of idle time i.e...

متن کامل

کاربرد روشهای هیورستیک اولویت وزنی و طولانی ترین زمان عملیات (LCR) متعادل سازی خطوط مونتاژ و تاثیر آن بر عملکرد سازمان

According to researches, one of the productivity barriers among many organizations is assembly line balancing problem, which needs scientific models to be solved. This paper examines the effect of line balancing on the functioning of assembly line in two sections. In the first section, after studying the theoretic bases and reviewing the literature, we have discussed the assembly concepts, diff...

متن کامل

A new heuristic method based on CPM in SALBP

The task of balancing of assembly lines is well-known in mass production system but this problem is NP-hard even for the simple straight line. Therefore, utilizing heuristic methods for these problems is totally unquestionable. Furthermore, in line with balancing problems, heuristic methods are the foundation of the metaheuristic methods, thus it seems to be necessary to use more efficient heur...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2001