Experimental Analysis of a Mixed-Mode Parallel Architecture Performing Sequence Sorting
نویسندگان
چکیده
EXPERIMENTAL ANALYSIS OF A MTXED-MODE PARALLEL ARCHITECTURE PERFORMING SEQUENCE SORTING Samuel A. Fineberg, [email protected] Thomas L. Casavant, tomc@eng. uiowa . edu Parallel Processing Laboratory Department of Electrical and Computer Engineering University of Iowa Iowa City, IA 52242 USA Howard Jay Siegel, h j @ecn. purdue . edu Parallel Processing Laboratory School of Electrical Engineering Purdue University West Lafayette, IN 47907 USA
منابع مشابه
Pareto-based Multi-criteria Evolutionary Algorithm for Parallel Machines Scheduling Problem with Sequence-dependent Setup Times
This paper addresses an unrelated multi-machine scheduling problem with sequence-dependent setup time, release date and processing set restriction to minimize the sum of weighted earliness/tardiness penalties and the sum of completion times, which is known to be NP-hard. A Mixed Integer Programming (MIP) model is proposed to formulate the considered multi-criteria problem. Also, to solve the mo...
متن کاملExperimental Analysis of a Mixed-Mode Parallel Architecture Using Bitonic Sequence Sorting
Experimentation aimed at determining the potential benefit of mixed-mode SIMD/MIMD parallel architectures is reported. The experimentation is based on timing measurements made on the PASM system prototype at Purdue utilizing carefully coded synthetic variations of a well-known algorithm. The synthetic algorithms used to measure and evaluate this system were based on the bitonic sorting of seque...
متن کاملA fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates
This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...
متن کاملSolving a New Multi-objective Unrelated Parallel Machines Scheduling Problem by Hybrid Teaching-learning Based Optimization
This paper considers a scheduling problem of a set of independent jobs on unrelated parallel machines (UPMs) that minimizesthe maximum completion time (i.e., makespan or ), maximum earliness ( ), and maximum tardiness ( ) simultaneously. Jobs have non-identical due dates, sequence-dependent setup times and machine-dependentprocessing times. A multi-objective mixed-integer linear programmi...
متن کاملA Hybrid Unconscious Search Algorithm for Mixed-model Assembly Line Balancing Problem with SDST, Parallel Workstation and Learning Effect
Due to the variety of products, simultaneous production of different models has an important role in production systems. Moreover, considering the realistic constraints in designing production lines attracted a lot of attentions in recent researches. Since the assembly line balancing problem is NP-hard, efficient methods are needed to solve this kind of problems. In this study, a new hybrid met...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 1990