Discrete optimisation and real-world problems
نویسندگان
چکیده
In the global economy, proper organisation and planning of production and storage locations, transportation and scheduling are vital to retain the competitive edge of companies. The planning and scheduling problems involved are immensely complex. Computer-based optimisation techniques are the best means of obtaining viable solutions, but until now the mixed integer programs developed have been able to deal only with simple problems. The more important larger problems have generally been solved using ad-hoc heuristics which often produce incomplete and less satisfactory solutions. Today, the development of new algorithms, software and hardware is leading to the provision of mathematical applications and tools which allow the solution of these larger problems in acceptable times. In this contribution two groups are addressed: on the one hand managers, and on the other hand a more technical oriented audience. The focus towards the first group is to create some attention with respect to the potential benefits of the method, to transmit a sense of what kind of problems can be tackled, and to increase the acceptance of the approach based on mixed-integer optimisation. The second group will be informed about the state-of-the-art, especially with respect to the use of high-performance computers and modern algorithmic aspects.
منابع مشابه
OPTIMisation using Intelligent Simulation Tools (OPTIMIST)
This paper describes the research project OPTIMIST at the University of Skövde. The project is focused on the development and application of intelligent techniques for simulation-based optimisation of real-world industrial problems. A software environment called OPTIMISE which tightly integrates Discrete-Event Simulation systems with AIbased optimisation is developed within the project.
متن کاملA Defined Benefit Pension Fund ALM Model through Multistage Stochastic Programming
We consider an asset-liability management (ALM) problem for a defined benefit pension fund (PF). The PF manager is assumed to follow a maximal fund valuation problem facing an extended set of risk factors: due to the longevity of the PF members, the inflation affecting salaries in real terms and future incomes, interest rates and market factors affecting jointly the PF liability and asset p...
متن کاملHandling Integrated Quantitative and Qualitative Search Space in a Real World Optimisation Problem
Since information in engineering design problems can be both quantitative (Q T ) and qualitative (Q L ) in nature, combining both types of information can result in more realistic solution for real world optimisation problems. However, most of the approaches reported in literature are incapable of conducting optimisation search in such mixed environment. Therefore this paper proposes a mathemat...
متن کاملMetamodel-Assisted Simulation-Based Optimisation of Manufacturing Systems (Camera Ready)
Many real-world manufacturing problems are too complex to be modelled analytically. In these scenarios, simulation-based optimisation is a powerful tool to determine optimal system settings. While traditional optimisation methods have been unable to cope with the complexities of many real-world problems approached by simulation, evolutionary methods have proven to be highly useful. This paper p...
متن کاملRobust DEA under discrete uncertain data: a case study of Iranian electricity distribution companies
Crisp input and output data are fundamentally indispensable in traditional data envelopment analysis (DEA). However, the real-world problems often deal with imprecise or ambiguous data. In this paper, we propose a novel robust data envelopment model (RDEA) to investigate the efficiencies of decision-making units (DMU) when there are discrete uncertain input and output data. The method is based ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 1995