Strategic Gang Scheduling for Railroad Maintenance
نویسندگان
چکیده
We address the railway track maintenance scheduling problem. The problem stems from the significant percentage of the annual budget invested by the railway industry for maintaining its railway tracks. The process requires consideration of human resource allocations (gangs), as well as effective logistics for equipment movement and routing around the rail network under time window constraints. We propose an efficient solution approach to minimize total costs incurred by the maintenance projects or jobs within a given planning horizon. This is accomplished by designing a job-time network model to capture feasible schedules under the constraints of job precedence and developing a mathematical programming heuristic to solve the underlying model. The key ingredient is an iterative process that extracts and then re-inserts jobs based on an integer programming model. Computational experiments show the capability of the proposed heuristic to schedule more than 1,000 jobs and more than 30 gangs.
منابع مشابه
Searching for multiobjective preventive maintenance schedules: Combining preferences with evolutionary algorithms
Heavy industry maintenance facilities at aircraft service centers or railroad yards must contend with scheduling preventive maintenance tasks to ensure critical equipment remains available. The workforce that performs these tasks are often high-paid, which means the task scheduling should minimize worker idle time. Idle time can always be minimized by reducing the workforce. However, all preven...
متن کاملMulticommodity network flow approach to the railroad crew-scheduling problem
We present our solution to the crew-scheduling problem for North American railroads. (Crew scheduling in North America is very different from scheduling in Europe, where it has been well studied.) The crew-scheduling problem is to assign operators to scheduled trains over a time horizon at minimal cost while honoring operational and contractual requirements. Currently, decisions related to crew...
متن کاملThe Scheduling of Rail at Union Pacific Railroad
The Union Pacific Railroad (UPRR) has over 3 1,000 miles of track covering a 24 state region. Planning and scheduling the production, packaging, delivery, and pickup of rail, involved in the maintenance of this network, is a very complex task. Manually scheduling only a subset of the resources required has historically taken several days to accomplish. Moreover, the inability to fully schedule ...
متن کاملTechnical Note: An opportunity cost maintenance scheduling framework for a fleet of ships: A case study
The conventional method towards deriving schedule for a fleet of ships to minimize cost alone has the short-coming of not addressing the problem of operation revenue losses associated with delays during maintenance at ships dockyards. In this paper, a preventive maintenance schedule for a fleet of ships that incorporates op-portunity cost is presented. The idea is to assign a penalty cost to al...
متن کاملLong Term Cost Effective Preventive Maintenance Scheduling
Preventive maintenance scheduling of generating units is addressed as a long-term scheduling in power system studies aiming to increase the reliability incorporating cost reduction. It consists of knowing which generating units should be shut down for regular safety inspection. In this paper, a new formulation of preventive maintenance scheduling associated with cost reduction index (CRI) is pr...