Field study on requirements engineering: Investigation of artefacts, project parameters, and execution strategies

نویسندگان

  • Daniel Méndez Fernández
  • Stefan Wagner
  • Klaus Lochmann
  • Andrea Baumann
  • Holger de Carne
چکیده

Context: Requirements Engineering (RE) is a critical discipline mostly driven by uncertainty, since it is influenced by the customer domain or by the development process model used. Volatile project environments restrict the choice of methods and the decision about which artefacts to produce in RE. Objective: We aim to investigate RE processes in successful project environments to discover characteristics and strategies that allow us to elaborate RE tailoring approaches in the future. Method: We perform a field study on a set of projects at one company. First, we investigate by content analysis which RE artefacts were produced in each project and to what extent they were produced. Second, we perform qualitative analysis of semi-structured interviews to discover project parameters that relate to the produced artefacts. Third, we use cluster analysis to infer artefact patterns and probable RE execution strategies, which are the responses to specific project parameters. Fourth, we investigate by statistical tests the effort spent in each strategy in relation to the effort spent in change requests to evaluate the efficiency of execution strategies. Results: We identified three artefact patterns and corresponding execution strategies. Each strategy covers different project parameters that impact the creation of certain artefacts. The effort analysis shows that the strategies have no significant differences in their effort and efficiency. Conclusions: In contrast to our initial assumption that an increased effort in requirements engineering lowers the probability of change requests or project failures in general, our results show no statistically significant difference between the efficiency of the strategies. In addition, it turned out that many parameters considered as the main causes for project failures can be successfully handled. Hence, practitioners can apply the artefact patterns and related project parameters to tailor the RE process according to individual project characteristics.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Field Study on Requirements Engineering Artefacts and Patterns

Requirements Engineering (RE) constitutes a critical discipline within Software Engineering. The quality of requirements is the backbone of project execution since the following phases strongly rely on it. Nowadays, industries are more then ever facing the problem that the RE process is highly volatile because it depends on the customer’s capabilities, on the used process models, and on the typ...

متن کامل

Field Study on Requirments Engineering Artefacts and Patterns

Requirements Engineering (RE) constitutes a critical discipline within Software Engineering. The quality of requirements is the backbone of project execution since the following phases strongly rely on it. Nowadays, industries are more then ever facing the problem that the RE process is highly volatile because it depends on the customer’s capabilities, on the used process models, and on the typ...

متن کامل

Developing Robust Project Scheduling Methods for Uncertain Parameters

A common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. As a result, project managers are often unable to meet the deadline time of the milestones. Robust project scheduling is an effective approach in case of uncertainty. Upon adopting this approach, schedules are protected against po...

متن کامل

A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm

In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...

متن کامل

Optimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms

The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Information & Software Technology

دوره 54  شماره 

صفحات  -

تاریخ انتشار 2012