We study the scheduling situation where n tasks, subjected to release dates and due dates, have to be scheduled on m parallel processors. We show that, when tasks have unit processing times and either require 1 or m processors simultaneously, the minimum maximal tardiness can be computed in polynomial time. The complexity status of this “tall/small” task scheduling problem P|ri, pi = 1, sizei ∈ {1, m} | Tmax was unknown before, even for 2 processors.
منابع مشابه
A Note on Scheduling Tall/Small Multiprocessor Tasks with Unit Processing Time to Minimize Maximum Tardiness
We study the scheduling situation where n tasks, subjected to release dates and due dates, have to be scheduled on m parallel processors. We show that, when tasks have unit processing times and either require 1 or m processors simultaneously, the minimum maximal tardiness can be computed in polynomial time. Two algorithms are described. The first one is based on a linear programming formulation...
متن کاملScheduling of a flexible flow shop with multiprocessor task by a hybrid approach based on genetic and imperialist competitive algorithms
This paper presents a new mathematical model for a hybrid flow shop scheduling problem with multiprocessor tasks in which sequence dependent set up times and preemption are considered. The objective is to minimize the weighted sum of makespan and maximum tardiness. Three meta-heuristic methods based on genetic algorithm (GA), imperialist competitive algorithm (ICA) and a hybrid approach of GA a...
متن کاملScheduling multiprocessor tasks on two parallel processors
In this work scheduling multiprocessor tasks on two parallel identical processors is considered. Multiprocessor tasks can be executed by more than one processor at the same moment of time. We analyze scheduling unit execution time and preemptable tasks to minimize schedule length and maximum lateness. Cases with ready times, due-dates and precedence constraints are discussed.
متن کاملA bi-objective model for a scheduling problem of unrelated parallel batch processing machines with fuzzy parameters by two fuzzy multi-objective meta-heuristics
This paper considers a bi-objective model for a scheduling problem of unrelated parallel batch processing machines to minimize the makespan and maximum tardiness, simultaneously. Each job has a specific size and the data corresponding to its ready time, due date and processing time-dependent machine are uncertain and determined by trapezoidal fuzzy numbers. Each machine has a specific capacity,...
متن کاملDesign of a Hybrid Genetic Algorithm for Parallel Machines Scheduling to Minimize Job Tardiness and Machine Deteriorating Costs with Deteriorating Jobs in a Batched Delivery System
This paper studies the parallel machine scheduling problem subject to machine and job deterioration in a batched delivery system. By the machine deterioration effect, we mean that each machine deteriorates over time, at a different rate. Moreover, job processing times are increasing functions of their starting times and follow a simple linear deterioration. The objective functions are minimizin...