Importance of the Pre-Industrial Baseline in Determining the Likelihood of Exceeding the Paris Limits

نویسندگان

  • Andrew P. Schurer
  • Michael E. Mann
  • Ed Hawkins
  • Simon F. B. Tett
  • Gabriele C. Hegerl
چکیده

During the Paris Conference in 2015, nations of the world strengthened the United Nations Framework Convention on Climate Change by agreeing to holding "the increase in the global average temperature to well below 2°C above pre-industrial levels and pursuing efforts to limit the temperature increase to 1.5°C"1. However, "pre-industrial" was not defined. Here we investigate the implications of different choices of the pre-industrial baseline on the likelihood of exceeding these two temperature thresholds. We find that for the strongest mitigation scenario RCP2.6 and a medium scenario RCP4.5 the probability of exceeding the thresholds and timing of exceedance is highly dependent on the pre-industrial baseline, for example the probability of crossing 1.5°C by the end of the century under RCP2.6, varies from 61% to 88% depending on how the baseline is defined. In contrast, in the scenario with no mitigation, RCP8.5, both thresholds will almost certainly be exceeded by the middle of the century with the definition of the pre-industrial baseline of less importance. Allowable carbon emissions for threshold stabilisation are similarly highly dependent on the pre-industrial baseline. For stabilisation at 2°C, allowable emissions decrease by as much as 40% when earlier than 19th century climates are considered as a baseline.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Paleoclimatological Context and Reference Level of the 2°C and 1.5°C Paris Agreement Long-Term Temperature Limits

The Paris Agreement adopted in December 2015 during the COP21 conference stipulates that the increase in the global average temperature is to be kept well below 2C above “pre-industrial levels” and that efforts are pursued to limit the temperature increase to 1.5C above “pre-industrial levels.” In order to further increase public acceptance of these limits it is important to transparently place...

متن کامل

Using Regression based Control Limits and Probability Mixture Models for Monitoring Customer Behavior

In order to achieve the maximum flexibility in adaptation to ever changing customer’s expectations in customer relationship management, appropriate measures of customer behavior should be continually monitored. To this end, control charts adjusted for buyer’s/visitor’s prior intention to repurchase or visit again are suitable means taking into account the heterogeneity across customers. In the ...

متن کامل

The Importance of Leadership and Organizational Capacity in Shaping Health Workers’ Motivational Reactions to Performance-Based Financing: A Multiple Case Study in Burkina Faso

Background Performance-based financing (PBF) is currently tested in many low- and middle-income countries as a health system strengthening strategy. One of the main mechanisms through which PBF is assumed to effect change is by motivating health workers to improve their service delivery performance. This article aims at a better understanding of such motivational effects of PBF. In partic...

متن کامل

Cut-off Grade Optimization for Maximizing the Output Rate

In the open-pit mining, one of the first decisions that must be made in production planning stage, after completing the design of final pit limits, is determining of the processing plant cut-off grade. Since this grade has an essential effect on operations, choosing the optimum cut-off grade is of considerable importance. Different goals may be used for determining optimum cut-off grade. One of...

متن کامل

An ex ante control chart for project monitoring using earned duration management observations

In the past few years, there has been an increasing interest in developing project control systems. The primary purpose of such systems is to indicate whether the actual performance is consistent with the baseline and to produce a signal in the case of non-compliance. Recently, researchers have shown an increased interest in monitoring project’s performance indicators, by plotting them on the S...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره 7  شماره 

صفحات  -

تاریخ انتشار 2017