Scheduling To Maximize Customer Satisfaction: A Project for the Shad Valley Program E. W. Richards and J. Bhadury E. Richards and J. Bhadury (1996). Scheduling To Maximize Customer Satisfaction: A Project for the Shad

نویسنده

  • J. Bhadury
چکیده

This paper describes a project that was done for the Shad Valley Program, where it was required to assign students to seminars so as to maximize the satisfaction of the students with their assignments. We begin by describing the problem, its inputs and constraints. Two models are proposed to determine optimal assignments. The first model is based on the Capacitated Transportation Problem and a network formulation is proposed to solve it. The second model is a two phase model whose first phase involves solving a Bottleneck Capacitated Transportation Problem and the second phase solving a Capacitated Transportation Problem. A simple search algorithm is proposed that solves the second model. Implementation of these models is described and the results obtained are discussed. Extensions to the two models are also proposed. Article:

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Integration of QFD, AHP, and LPP methods in supplier development problems under uncertainty

Quality function deployment (QFD) is a customer-driven approach, widely used to develop or process new product to maximize customer satisfaction. Last researches used linear physical programming (LPP) procedure to optimize QFD; however, QFD issue involved uncertainties, or fuzziness, which requires taking them into account for more realistic study. In this paper, a set of fuzzy data is used to ...

متن کامل

Two phase genetic algorithm for vehicle routing and scheduling problem with cross-docking and time windows considering customer satisfaction

Cross-docking is a new warehousing policy in logistics which is widely used all over the world and attracts many researchers attention to study about in last decade. In the literature, economic aspects has been often studied, while one of the most significant factors for being successful in the competitive global market is improving quality of customer servicing and focusing on customer satisfa...

متن کامل

A multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations

The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...

متن کامل

Electronic Banking and Customer Satisfaction in Bank Melli Iran

Many e-commerce transactions via e-payment systems is carried out. The aim of this study is that the theory of structures, an empirical analysis about the importance and ranking key factors that may be on customer satisfaction in electronic payment systems affect the Iranian banks.9 specific topics of the factors in e-payment systems, customer satisfaction and affect are more key, were selected...

متن کامل

A stochastic model for project selection and scheduling problem

Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011