Uncertainty analysis at large scales: limitations and subjectivity of current practices--a water quality case study.
نویسندگان
چکیده
Uncertainty analysis for large-scale model studies is a challenging activity that requires a different approach to uncertainty analysis at a smaller scale. However, in river basin studies, the practice of uncertainty analysis at a large scale is mostly derived from practice at a small scale. The limitations and inherent subjectivity of some current practices and assumptions are identified, based on the results of a quantitative uncertainty analysis exploring the effects of input data and parameter uncertainty on surface water nutrient concentration. We show that: (i) although the results from small- scale sensitivity analysis are often applied at larger scales, this is not always valid; (ii) the current restriction of the uncertainty assessment to uncertainty types with a strong evidence base gives structurally conservative estimates; (iii) uncertainty due to bias is usually not assessed, but it may easily outweigh the effects of variability; (iv) the uncertainty bandwidth may increase for higher aggregation levels, although the opposite is the standard assumption.
منابع مشابه
Water Quality Restoration Using Landscape Metrics Analysis: A Case Study in the Golestan Province of Iran
Abstract The results of an integrated study aimed at restoring water quality in a large watershed including seven catchments in north east Iran are presented in this paper. This case study demonstrates how landscape metrics reflect direct or surrogate causes of the land use practices that are the determinants of water quality parameters. Water quality factors included EC, pH, Cl-1, HCO3-1, SO4-...
متن کاملSustainable Planning of Supply Chains in Large-Scale Systems with Real Options Analysis
This paper presents a structure that empower designing supervisory groups to survey the estimation of real options in projects of enormous scale, incompletely standardized frameworks actualized a couple of times over the medium term. Specific options writing is done using a methodology of planning the design and making prior decisions regarding the arrangements of specific options, with a recre...
متن کاملA Comprehensive Study of Several Meta-Heuristic Algorithms for Open-Pit Mine Production Scheduling Problem Considering Grade Uncertainty
It is significant to discover a global optimization in the problems dealing with large dimensional scales to increase the quality of decision-making in the mining operation. It has been broadly confirmed that the long-term production scheduling (LTPS) problem performs a main role in mining projects to develop the performance regarding the obtainability of constraints, while maximizing the whole...
متن کاملتخمین
Temporal and spatial distribution of water components in watersheds, estimation of water quality, and uncertaintiesassociated with these estimations are important issues in freshwater studies. In this study, Soil and Water AssessmentTool (SWAT) model was used to estimate components of freshwater availability: blue water (surface runoff plus deepaquifer recharge), green water flow (actual evapot...
متن کاملOptimization Model of Hirmand River Basin Water Resources in the Agricultural Sector Using Stochastic Dynamic Programming under Uncertainty Conditions
In this study, water management allocated to the agricultural sector’ was analyzed using stochastic dynamic programming under uncertainty conditions. The technical coefficients used in the study referred to the agricultural years, 2013-2014. They were obtained through the use of simple random sampling of 250 farmers in the region for crops wheat, barley, melon, watermelon and ruby grapes under ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Water science and technology : a journal of the International Association on Water Pollution Research
دوره 56 6 شماره
صفحات -
تاریخ انتشار 2007