Project management using point graphs

نویسندگان

  • Mashhood Ishaque
  • Abbas K. Zaidi
  • Alexander H. Levis
چکیده

The paper presents a graph-based approach for scheduling and monitoring temporal events and activities in a system engineering project. It attempts to overcome some of the limitations of traditional project management approaches by allowing specifications of real-time milestones, and by breaking the finish-start barrier between the activities. An illustrative example presents the approach.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Predicting project time and costs using earned value management based on trapezoidal fuzzy numbers

Projects include activities that must be carried out at certain dates, with specified costs and determined qualities in order to satisfy the stakeholders. Project control is one of the most important and widely used issues in project-based organizations and it has attracted a lot of attention. So far, in the field of project control, there have been a lot of research that were done in different...

متن کامل

Self-Starting Control Chart and Post Signal Diagnostics for Monitoring Project Earned Value Management Indices

Earned value management (EVM) is a well-known approach in a project control system which uses some indices to track schedule and cost performance of a project. In this paper, a new statistical framework based on self-starting monitoring and change point estimation is proposed to monitor correlated EVM indices which are usually auto-correlated over time and non-normally distributed. Also, a new ...

متن کامل

Investment Decision-Making about Portfolio of Technology Development Projects; Based on the Analysis of Success Criteria using Fuzzy Neural Network and MADM

Technology development project is a type of investment project and it is important to identify the performance indicators and planning for the correct investment. The purpose of this research is the development of indicators of portfolio success, accurate analysis of the effects of indicators on each other and the achievement of a proper investment model. In this research, the success criteria ...

متن کامل

A Simulation Based of Setting Policy in Project Acceptance Based on Experiences in Project-Driven SME's

The acceptance of the right project which leads to the realization of the set objectives is one of the most important issues in project-oriented companies. Therefore, corporate managers prefer to work on those projects which ensures the achievement of goals such as increasing financial profits or being the top brands in their rivals market. The present  research aimed at introducing  a systemat...

متن کامل

Using fuzzy FMEA and fuzzy logic in project risk management

Risk management is one of the most important phases of project management and isthe most recently used by many researchers. In this paper, a fuzzy based method wasproposed which identifies different kinds of risks through the project life cycle.Then, the project risk magnitude can be obtained in regards to five factors, namely“severity”, “occurrence”, and “not detection” which form fuzzy FMEA a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Systems Engineering

دوره 12  شماره 

صفحات  -

تاریخ انتشار 2009