R&D project selection using the analytic network process

نویسندگان

  • Laura M. Meade
  • Adrien Presley
چکیده

The analytic network process (ANP) is presented as a potentially valuable method to support the selection of projects in a research and development (R&D) environment. This paper first discusses the requirements of the R&D project selection problem, which requires the allocation of resources to a set of competing and often disparate project proposals. Among the factors complicating this task is the need to make the decision within the framework of an enterprise’s strategic objectives and organizational structure while considering and integrating financial and strategic benefits of each project. The paper discusses the use of the ANP, a general form of Saaty’s analytic hierarchy process, as a model to evaluate the value of competing R&D project proposals. A generic ANP model developed by the authors, which includes in its decision levels the actors involved in the decision, the stages of research, categories of metrics, and individual metrics, is presented. The paper concludes with a case study describing the implementation of this model at a small high-tech company, including data based on the actual use of the decision making model.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Comprehensive Model for R and D Project Portfolio Selection with Zero-One Linear Goal-Programming (RESEARCH NOTE)

Technology centered organizations must be able to identify promising new products or process improvements at an early stage so that the necessary resources can be allocated to those activities. It is essential to invest in targeted research and development (R and D) projects as opposed to a wide range of ideas so that resources can be focused on successful outcomes. The selection of the most ap...

متن کامل

Fuzzy Analytic Network Process in Evaluating Government-Sponsored Technology R&D Projects

Technology is viewed as one of the major factors determining the competitiveness position of an industry. For the sake of technology competitiveness; however, countries need to encourage private firms to develop technology R&D projects. How to select proper R&D projects to be supported for governments is very important policy. In this study we propose a hierarchical dependence structure for ITD...

متن کامل

Locating of planting project using Analytic Hierarchy Process and Fuzzy logic (case study: Maravehtappe watershed, Golestan province)

Planting project is one of the methods for improvement of rangeland degradation that exact implementation depends on many factors. Therefore, there is a need for a fundamental method. In the present study for locating planting project, in Maravehtappe watershed, analytic hierarchical process and fuzzy logic are applied. In this study, four ecological criteria of vegetation, soil, physiography a...

متن کامل

Identification and ranking risks of horizontal directional drilling for oil & gas wells by using fuzzy analytic network process, a case study for Gachsaran oil field wells

Risk ranking of Horizontal Directional Drilling (HDD) for gas and oil wells is a key criterion in the project feasibility, pricing and for introducing a risk management strategy that aims to reduce the number of failures in the installation phase and its negative consequences. HDD is currently widely used in drilling wells in Iran, but research in the area of identification and risks ranking of...

متن کامل

Application of Analytic Network Process in Selection of Six-Sigma Projects

This research aims at presenting a fuzzy model to evaluate and select Six-Sigma projects.  For this purpose, a model of fuzzy analytic network process (ANP) was designed to consider the relation and mutual impact among the factors. In order to evaluate the projects, nine sub-criteria were considered which were classified into three categories of business, finance and procedural ones. Also to co...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • IEEE Trans. Engineering Management

دوره 49  شماره 

صفحات  -

تاریخ انتشار 2002