The Individuals Control Chart in Case of Non-Normality

نویسندگان

  • Betül Kan
  • Berna Yazici
  • Berna Yazıcı
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A New Bootstrap Based Algorithm for Hotelling’s T2 Multivariate Control Chart

Normality is a common assumption for many quality control charts. One should expect misleading results once this assumption is violated. In order to avoid this pitfall, we need to evaluate this assumption prior to the use of control charts which require normality assumption. However, in certain cases either this assumption is overlooked or it is hard to check. Robust control charts and bootstra...

متن کامل

The Individuals Control Charts for Burr Distributed Data

The setting of the control limits to utilize on a control chart supposes the assumption of the normality. However, in many situations, this condition does not hold. There are numerous studies on the control charts when the underlying distribution is non-normal. This paper examines the effects of non-normality as measured by skewness and provides an alternative method of designing individuals co...

متن کامل

Robustness of the EWMA Control Chart to Non-normality for Autocorrelated Processes

Most commonly used control charts for monitoring quality characteristics of the processes were developed under the assumption that the observations are randomly sampled from a normal population. It is well known that these control charts have more false alarms than usual when processes are positively autocorrelated. One remedy is to adjust the control limits such that the modified control chart...

متن کامل

The X Control Chart under Non-Normality

This paper studies design schemes for the X control chart under non-normality. Different estimators of the standard deviation are considered and the effect of the estimator on the performance of the control chart under non-normality is investigated. Two situations are distinguished. In the first situation, the effect of non-normality on the X control chart is investigated by using the control l...

متن کامل

An ex ante control chart for project monitoring using earned duration management observations

In the past few years, there has been an increasing interest in developing project control systems. The primary purpose of such systems is to indicate whether the actual performance is consistent with the baseline and to produce a signal in the case of non-compliance. Recently, researchers have shown an increased interest in monitoring project’s performance indicators, by plotting them on the S...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2017