Risk Identification for the Construction Phases of the Large Bridge Based on WBS-RBS

نویسندگان

  • Qing-Fu Li
  • Peng Zhang
  • Yan-Chao Fu
چکیده

For the construction environment of large bridges is complex and there are too much uncertain factors during the course of the construction, it is difficult for the general method of risk identification to identify the risks wholly and systematically. This study presents a new method of risk identification with modular analysis based on WBS-RBS (Work Breakdown Structure-Risk Breakdown Structure). For the purpose of the better application of this new method in the risk identification of large bridges, a BCICS (Bridge Construction Information Classification System) suitable for construction phase of large bridges was established based on the information classification system of ISO (International Standardization Organization). In order to provide a uniform communication language for the risk analysis personnel, the WBS of the construction of large bridges was established, which was beneficial to the judgment of the matrix elements of the RBM (Risk Breakdown Structure) applying the method of NGT (Nominal Group Technique). The coding system based on BCICS and RBS presented in this study is convenient for the modularized computer storage of the risk information of large bridges in construction phase and has great contribution to establishing the risk database of large bridges in construction phase.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

تجزیه و تحلیل سیستم مدیریت ریسک هایHSE و مدل سازی ارتباط آن با حوادث شغلی در صنعت ساخت و ساز

Introduction:Risk of occupational accidents in construction industry and sites is very high and dangerous. The establishment of an effective and efficient risk management system is an important step in prevention of construction accidents. The purpose of this study was to analyze the HSE risk management systems in large construction sites and their association with the occupational accidents. ...

متن کامل

A Model for Prioritizing the Risks Associated with Road Construction Projects Based on Generalized Secondary Goal

   This paper aims at providing a new model based on Data Envelopment Analysis (DEA) to prioritize project risks. It is clear that the large amounts of involved capitals, the long term of infrastructure projects’ implementation, and the project management problems in on-time completion of projects indicate the necessity of paying particular attention to this issue and conducting applied researc...

متن کامل

مدل تلفیقی ارزیابی ریسک بهداشت، ایمنی و محیط زیست (HSE) بر اساس استاندارد راهنمای مدیریت پروژه PMBOK

Introduction: The necessity of risk management in construction projects in order to reduce accidents, achievement of the project goals, guaranteeing the survival of the organization and satisfying customers is inevitable. Therefore, attention to the risk management issue as apart of the risk macro topic in PMBOK can also play a significant role in identifying, assessing and controlling the HSE ...

متن کامل

Safety Risks Impacts Analysis on Construction Project Objectives Using a Hybrid Model of Fuzzy Expert System and Latin Hyper Cube Sampling

Background and aims: The construction industry has a high rate of fatal or nonfatal injuries and all around the world which remains one of the most dangerous occupations till now. Since project safety and measuring danger in the construction industry is a crucial subject, so this study aimed to measure the impacts of safety risks on the time and cost objectives of project using a hybrid method ...

متن کامل

Designing a quantitative safety checklist for the construction phase of ongoing projects in petrochemical plants

Background: One of the challenges in construction is the occurrence of numerous accidents. In this regard, risk assessment can play an important role in reducing accidents. The aim of this study was to prepare comprehensive and quantitative checklists to determine the potential hazards in the construction phase. Materials and Methods: The present descriptive and analytical study was carried ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013