Minimizing the Maximum Flow Time in the Online-TSP on the Real Line
نویسندگان
چکیده
In the online traveling salesman problem (OlTsp) requests for visits to cities arrive online while the salesman is traveling. The Fmax-OlTsp has as objective to minimize the maximum flow time, which is particularly interesting for applications. Unfortunately, there can be no competitive algorithm, neither deterministic nor randomized. Hence, competitive analysis fails to distinguish online algorithms. Not even resource augmentation which is helpful in scheduling works as a remedy. This motivates the search for alternative analysis methods. We introduce a natural restriction on the adversary for the Fmax-OlTsp on the real line. A non-abusive adversary may only move in a direction where there are yet unserved requests. Our main result is an 8-competitive algorithm against the non-abusive adversary.
منابع مشابه
Meta heuristic for Minimizing Makespan in a Flow-line Manufacturing Cell with Sequence Dependent Family Setup Times
This paper presents a new mathematical model for the problem of scheduling part families and jobs within each part family in a flow line manufacturing cell where the setup times for each family are sequence dependent and it is desired to minimize the maximum completion time of the last job on the last machine (makespan) while processing parts (jobs) in each family together. Gaining an optimal s...
متن کاملA Basic Period Approach for Solving the Economic Lot and Delivery Scheduling in Flexible Flow Lines
In this paper, the problem of lot sizing, scheduling and delivery of several items in a two-stage supply chain over a finite planning horizon is studied. Single supplier via a flexible flow line production system (FFL), produces several items and delivers them directly to an assembly facility. Based on basic period (BP) strategy, a new mixed zero-one nonlinear programming model has been develop...
متن کاملReal-time acoustic tomography system and the experience of Caspian current sea monitoring
The Acoustic Tomography (AT) systems are used to monitor long-term and continuous flow in rivers, seas and oceans. One of the disadvantages of existing systems in Iran is the inability of real-time/automated measurements. In this study, by adding a raspberry Pi computer to the system and performing the required programming, it was possible to do online monitoring. The data are transferred to th...
متن کاملMarkov Chain Anticipation for the Online Traveling Salesman Problem by Simulated Annealing Algorithm
The arc costs are assumed to be online parameters of the network and decisions should be made while the costs of arcs are not known. The policies determine the permitted nodes and arcs to traverse and they are generally defined according to the departure nodes of the current policy nodes. In on-line created tours arc costs are not available for decision makers. The on-line traversed nodes are f...
متن کاملMinimizing Makespan with Start Time Dependent Jobs in a Two Machine Flow Shop
[if gte mso 9]> The purpose of this paper is to consider the problem of scheduling a set of start time-dependent jobs in a two-machine flow shop, in which the actual processing times of jobs increase linearly according to their starting time. The objective of this problem is to minimize the makespan. The problem is known to be NP-hardness[ah1] ; therefore, there is no polynomial-time algorithm...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2002