An improved formulation of the underground mine scheduling optimization problem when considering selective mining
نویسندگان
چکیده
The use of mixed integer programming is a modeling approach well suited to formulate the mine scheduling optimization problem for both open pit and underground mining. The resolution applied for discretizing the problem, however, has a direct effect on both the level of selectivity that can be applied to improve profitability, as well as the computational feasibility. The proposed model allows for a balance in reducing the resolution used in discretizing the underground mine scheduling problem, while maintaining enough detail that will allow the generation of mine production schedules that improve profitability through selective mining. As a secondary contribution, an improved formulation set within a resource production/consumption framework is presented, which can potentially simplify notation used in formulating underground mine scheduling optimization problems.
منابع مشابه
A Comprehensive Study of Several Meta-Heuristic Algorithms for Open-Pit Mine Production Scheduling Problem Considering Grade Uncertainty
It is significant to discover a global optimization in the problems dealing with large dimensional scales to increase the quality of decision-making in the mining operation. It has been broadly confirmed that the long-term production scheduling (LTPS) problem performs a main role in mining projects to develop the performance regarding the obtainability of constraints, while maximizing the whole...
متن کاملRobust production scheduling in open-pit mining under uncertainty: a box counterpart approach
Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust opti...
متن کاملA New Mathematical Model for Production Scheduling in Sub-level Caving Mining Method
Production scheduling in underground mines is still a manual process, and achieving a truly optimal result through manual scheduling is impossible due to the complexity of the scheduling problems. Among the underground mining methods, sub-level caving is a common mining method with a high production rate for hard rock mining. There are limited studies about long-term production scheduling...
متن کاملA genetic algorithm approach for open-pit mine production scheduling
In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...
متن کاملAn Uncertainty-based Transition from Open Pit to Underground Mining
There are some large scale orebodies that extend from surface to the extreme depths of the ground. Such orebodies should be extracted by a combination of surface and underground mining methods. Economically, it is highly important to know the limit of upper and lower mining activities. This concern leads the mine designers to the transition problem, which is one of the most complicated problems...
متن کامل