Restarted Iterated Pareto Greedy algorithm for multi-objective flowshop scheduling problems
نویسندگان
چکیده
Multi-objective optimisation problems have seen a large impulse in the last decades. Many new techniques for solving distinct variants of multi-objective problems have been proposed. Production scheduling, as with other operations management elds, is no di erent. The owshop problem is among the most widely studied scheduling settings. Recently, the Iterated Greedy methodology for solving the single-objective version of the owshop problem has produced state-of-the-art results. This paper proposes a new algorithm based on Iterated Greedy technique for solving the multiobjective permutation owshop problem. This algorithm is characterised by an e ective initialisation of the population, management of the Pareto front, and a specially tailored local search, among other things. The proposed multi-objective Iterated Greedy method is shown to outperform other recent approaches in comprehensive computational and statistical tests that comprise a large number of instances with objectives involving makespan, tardiness and owtime. Lastly, we use a novel graphical tool to compare performances of stochastic Pareto fronts based on Empirical Attainment Functions.
منابع مشابه
Multi-objective sequence dependent setup times permutation flowshop: A new algorithm and a comprehensive study
Please cite this article in press as: Ciavotta, M., e prehensive study. European Journal of Operatio The permutation flowshop scheduling problem has been thoroughly studied in recent decades, both from single objective as well as frommulti-objective perspectives. To the best of our knowledge, little has been done regarding the multi-objective flowshop with Pareto approach when sequence dependen...
متن کاملNew results for the multi-objective sequence dependent setup times flowshop problem
Although many papers deal with the permutation flowshop scheduling problem with or without setups, according to our knowledge, little has been published tackling multi-objective optimization in presence of sequence dependent setup times. Hence, in this work we cope with this problem considering two pairs of well known independent objectives, the Cmax−TWT (Makespan-Total Weighted Tardiness ) and...
متن کاملَA Multi-objective simulated annealing algorithm to solving flexible no-wait flowshop scheduling problems with transportation times
This paper deals with a bi-objective hybrid no-wait flowshop scheduling problem minimizing the makespan and total weighted tardiness, in which we consider transportation times between stages. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time by using traditional approaches and optimization tools is extremely difficult. This paper presen...
متن کاملAn Iterated Greedy Algorithm for Solving the Blocking Flow Shop Scheduling Problem with Total Flow Time Criteria
In this paper, we propose an iterated greedy algorithm for solving the blocking flow shop scheduling problem with total flow time minimization objective. The steps of this algorithm are designed very efficient. For generating an initial solution, we develop an efficient constructive heuristic by modifying the best known NEH algorithm. Effectiveness of the proposed iterated greedy algorithm is t...
متن کاملHeuristics for a flowshop scheduling problem with stepwise job objective function
In this work, we introduce the Flowshop Scheduling Problem with Delivery Dates and Cumulative Payoffs. This problem is a variation of the flowshop scheduling problem with job release dates that maximizes the total payoff with a stepwise job objective function. This paper contributes towards proposing a mathematical formulation for this new problem and an original constructive heuristic. Additio...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Computers & OR
دوره 38 شماره
صفحات -
تاریخ انتشار 2011