B-vhf – System Simulation Results and Final Assessment

نویسنده

  • M. Schnell
چکیده

In this paper, an overview of the NEWSKY project is given. This project is funded by the European Commission within the 6th framework program and will start in January 2007. The NEWSKY project is a feasibility study to clarify if it is possible to establish a heterogeneous network for aeronautical communications which is capable to integrate different communications systems as well as different applications into a single global aeronautical network. The envisaged applications comprise not only air-traffic control and management but also airline and passenger communications. Figure 1: Expected development of the data communication needs for ATC/ATM and roadmap for the introduction of new ATC/ATM communications systems (Source: Eurocontrol).

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Low Settling Time All Digital DLL For VHF Application

Settling time is one of the most important parameter in design of DLLs. In this paper we propose a new high speed with low settling time Delay Locked Loop (DLL) in which a digital signal processor (DSP) is used instead of using phase-frequency detector, charge pump and loop filter in conventional DLL. To have better settling time, PRP conjugate gradient algorithm is used to optimize delay of ea...

متن کامل

Designing a Fuzzy Inference System to Estimate the Scores of Assessment Centers

One of the methods used to measure and evaluate employees is the assessment center. Assessment centers usually have good validity at the instrumental level, but have weaknesses at the summation level. This research seeks to provide a fuzzy system for estimating AC final scores based on competency, intelligence and personality scores by modeling mentality of experts in this field. For this purpo...

متن کامل

Loss of Load Expectation Assessment in Deregulated Power Systems Using Monte Carlo Simulation and Intelligent Systems

Deregulation policy has caused some changes in the concepts of power systems reliability assessment and enhancement. In this paper, generation reliability is considered, and a method for its assessment using intelligent systems is proposed. Also, because of power market and generators’ forced outages stochastic behavior, Monte Carlo Simulation is used for reliability evaluation. Generation r...

متن کامل

طراحی،تحلیل و ساخت آنتن دو بانده برای یک ماهواره LEO کوچک

Separated Turnstile (ST) Antenna has many applications in small Low Earth Orbit (LEO) satellites. Ability of dual-band operation and circular polarization are the main features of this antenna. The purpose of this paper is design and analysis of a Separated Turnstile antenna, which can work in UHF and VHF band simultaneously. The antenna has saddle-shaped radiation pattern in UHF band for data ...

متن کامل

Assessment of VSM Scenarios by Simulation of Logistics Systems in Petrochemical Company

Believe that VSM involves the concurrent improve of processes, organizations, and their supporting information systems to achieve radical improvement in time, cost, quality, and customer’s regard for the company’s products and services.  Nowadays, simulation is the most important way to do VSM and improving logistics processes. A time study was performed by measuring the time duration per proce...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006