Development of the safety control framework for shield tunneling in close proximity to the operational subway tunnels: case studies in mainland China

نویسندگان

  • Xinggao Li
  • Dajun Yuan
چکیده

INTRODUCTION China's largest cities like Beijing and Shanghai have seen a sharp increase in subway network development as a result of the rapid urbanization in the last decade. The cities are still expanding their subway networks now, and many shield tunnels are being or will be constructed in close proximity to the existing operational subway tunnels. The execution plans for the new nearby shield tunnel construction calls for the development of a safety control framework-a set of control standards and best practices to help organizations manage the risks involved. CASE DESCRIPTION Typical case studies and relevant key technical parameters are presented with a view to presenting the resulting safety control framework. The framework, created through collaboration among the relevant parties, addresses and manages the risks in a systematic way based on actual conditions of each tunnel crossing construction. The framework consists of six parts: (1) inspecting the operational subway tunnels; (2) deciding allowed movements of the existing tunnels and tracks; (3) simulating effects of the shield tunneling on the existing tunnels; (4) doing preparation work; (5) monitoring design and information management; and (6) measures and activation mechanism of the countermeasures. The six components are explained and demonstrated in detail. DISCUSSION AND EVALUATION In the end, discussions made involve construction and post-construction settlement of the operational tunnel, application of the remedial grouting to rectify excessive settlements of the operational tunnel, and use of the innovative tool of the optical fiber measurement for tunnel movement monitoring. CONCLUSIONS It is concluded that the construction movement of the tunnel can be controlled within 15 mm when the shield machine is <7 m in excavation diameter. The post-construction settlement of the tunnel buried in the very soft ground is much greater than its construction settlement, and last several years until reaching a final stable state. Two cases are outlined to demonstrate the feasibility of using the remedial grouting to reduce the long-term settlement of the operational tunnels. The more and more segmental tunnels being constructed, there is an increasing need of the optical fiber measurement for tunnel movement monitoring in the near future.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Geological Hazards analysis in Urban Tunneling by EPB Machine (Case study: Tehran subway line 7 tunnel)

Technological progress in tunneling has led to modern and efficient tunneling methods in vast underground spaces even under inappropriate geological conditions. Identification and access to appropriate and sufficient geological hazard data are key elements to successful construction of underground structures. Choice of the method, excavation machine, and prediction of suitable solutions to over...

متن کامل

Prediction of maximum surface settlement caused by earth pressure balance shield tunneling using random forest

Due to urbanization and population increase, need for metro tunnels, has been considerably increased in urban areas. Estimating the surface settlement caused by tunnel excavation is an important task especially where the tunnels are excavated in urban areas or beneath important structures. Many models have been established for this purpose by extracting the relationship between the settlement a...

متن کامل

Introducing hard rock TBMs’ downtime analysis model with reference to past case histories’ data

The study of downtime and subsequently machine utilization in a given project is one of the major requirements of an accurate estimation of TBM performance and daily advance rate. Interestingly, while it is very common to report the components of downtime when discussing a tunneling project in the literature; there has not been a great amount of in-depth studies on this topic in the recent year...

متن کامل

Optimal Selection of Underground Parking Lines Arrangement: A Case Study of Tehran Subway Line 7

Due to the development of urban subway lines in order to extend public transportation and to accommodate the increased number of trains, depot and parking are necessary. This is to provide a space for parking trains in non-operating hours and to carry out maintenance and repair operations on trains. Subway depot is a predetermined space where trains, washing, car parks, and refueling work are p...

متن کامل

Use of a 10.22 m diameter EPB shield: a case study in Beijing subway construction

INTRODUCTION Beijing subway line 14 includes four stations and approximately 2.8 km of tunnels between the Dongfengbeiqiao and Jingshunlu areas of the city. Due to the surface and underground space limitations of this section, a double-track running tunnel instead of two single-track running tunnels was adopted to connect the two stations. The double-track tunnels were excavated by a 10.22 m di...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره 5  شماره 

صفحات  -

تاریخ انتشار 2016