A linear programming and constraint propagation-based lower bound for the RCPSP
نویسندگان
چکیده
A new destructive lower bound for the resource-constrained project scheduling problem is presented. Given are n activities which have to be processed without preemptions. During the processing period of an activity constant amounts of renewable resources are needed where the available capacity of each resource type is limited. Furthermore, nish-start precedence relations between the activities are given. The objective is to determine a schedule with minimal makespan. The lower bound calculations are based on two methods for proving infeasibility of a given threshold value T for the makespan. The rst uses constraint propagation techniques, while the second is based on a linear programming formulation. A column generation procedure is presented for the linear programming formulation and computational results are reported for an algorithm combining both concepts.
منابع مشابه
Constraint-Propagation-Based Cutting Planes: An Application to the Resource-Constrained Project Scheduling Problem
W propose a cooperation method between constraint programming and integer programming to compute lower bounds for the resource-constrained project scheduling problem (RCPSP). The lower bounds are evaluated through linear-programming (LP) relaxations of two different integer linear formulations. Efficient resource-constraint propagation algorithms serve as a preprocessing technique for these rel...
متن کاملRESOLUTION METHOD FOR MIXED INTEGER LINEAR MULTIPLICATIVE-LINEAR BILEVEL PROBLEMS BASED ON DECOMPOSITION TECHNIQUE
In this paper, we propose an algorithm base on decomposition technique for solvingthe mixed integer linear multiplicative-linear bilevel problems. In actuality, this al-gorithm is an application of the algorithm given by G. K. Saharidis et al for casethat the rst level objective function is linear multiplicative. We use properties ofquasi-concave of bilevel programming problems and decompose th...
متن کاملHybrid Approach of Constraint Programming and Integer Programming for Solving Resource - constrained Project - scheduling Problems
Abstract—Resource –constrained project scheduling problem (RCPSP) is a well known NP hard problem. This paper proposes a hybrid approach of constraint programming (CP) and integer programming (IP) which could solve RCPSP with ideal efficiency and quality. Constraint propagation is key element of constraint programming and is widely used in cumulative resource problem (CRP). CRP can be taken as ...
متن کاملSatisfiability Modulo Theories: An Efficient Approach for the Resource-Constrained Project Scheduling Problem
The Resource-Constrained Project Scheduling Problem (RCPSP) and some of its extensions have been widely studied. Many approaches have been considered to solve this problem: constraint programming (CP), Boolean satisfiability (SAT), mixed integer linear programming (MILP), branch and bound algorithms (BB) and others. In this paper, we present a new approach for solving this problem: satisfiabili...
متن کاملHeuristic approach to solve hybrid flow shop scheduling problem with unrelated parallel machines
In hybrid flow shop scheduling problem (HFS) with unrelated parallel machines, a set of n jobs are processed on k machines. A mixed integer linear programming (MILP) model for the HFS scheduling problems with unrelated parallel machines has been proposed to minimize the maximum completion time (makespan). Since the problem is shown to be NP-complete, it is necessary to use heuristic methods to ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- European Journal of Operational Research
دوره 127 شماره
صفحات -
تاریخ انتشار 2000